Similar Projects
Roof Replacement for Governmental Center Roof, Dept of Social Services Building and the Rockingham County Stoneville Library
Alteration
Bidding
Reidsville, NC 27320

Reroofing of Developments NC19P036001 and 002
Alteration
Bidding
Selma, NC

Blumenthal Performing Arts Center (PAC) Roof Replacement - Lower Level
Post-Bid
Less than $469,000 est. value
Charlotte, NC 28202

Stonewall Jackson YDC Maintenance Building Roof Replacement
Post-Bid
Concord, NC 28027

New Roof and Overflow Drains at Solomon Towers
Results
Wilmington, NC

Joint Force Headquarters Paver Replacement
Results
Less than $453,000 est. value
Raleigh, NC 27607

Agricultural Center Roofing Project
Alteration
Bidding
Statesville, NC 28677

Belfry Tower Roof Replacement and Terra-Cotta Repairs
Post-Bid
Asheville, NC 28802

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

Johnston Street Global Roof Replacement
Alteration
Bidding
High Point, NC 27262

Repair Leaking Roof, Warehouse
Post-Bid
Less than $25,000 est. value
Cherry Point, NC 28533

J.F. Webb High School Partial Roof Replacements
Results
Oxford, NC 27565

WPCC - Patton Hall and Building E Roof Replacement
Post-Bid
Morganton, NC 28655

Roof Replacement at Durham County East Sheriff Station
Results
Less than $38,500 est. value
Durham, NC

Re-Roofing of the Margaret Hearne Elementary School
Post-Bid
Wilson, NC 27893

Last Updated 07/01/2021 01:44 PM
Project Title

Fire Station 7 Roof Replacement

Physical Address View project details and contacts
City, State (County) Durham, NC 27704   (Durham County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status All Bids Received, Results Expected August 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Asphalt shingles are to be a standard three-tab, 20year min 2. The flat roof section needs to be fully removed down to the deck. Inspect the deck and repair any damaged area. Install new rigid board tapered insulation and a new EPDM membrane glued down. 3. Replace all plumbing vent boots, metal rake, drip-edge and fascia flashing. Flashing and counter-flashing in good condition can remain, but any damaged or failing flashing is to be replaced. 4. Replace the shed roofing on both exterior door canopies. Replace all flashing, counterflashing and trim. 5. Install “Kick-Out” flashing trim at all roof to wall intersections to direct storm water into gutters or out and away from the masonry walls 6. The intent is to install a complete and weather tight 20yr roof system.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents