Similar Projects
Starbucks
New Construction - 2,200 SF
Conception
$500,000 to $1,000,000 CJ est. value
Summerville, SC 29485

Intersection Improvement US 176 (State Rd)/S-135 (Mudville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Ridgeville, SC 29472

O'Reilly Auto Parts (SL4)
New Construction - 6,800 SF
Design
$500,000 to $900,000 est. value
Summerville, SC

Sawmill Apartments
New Construction, Infrastructure
Design
$55,000,000 CJ est. value
Summerville, SC 29483

Parking Lot Striping at Cane Bay High School
Infrastructure
Bidding
$100,000 CJ est. value
Summerville, SC 29483

Parking Lot Striping at Cane Bay High School
Infrastructure
Bidding
$100,000 CJ est. value
Summerville, SC 29483

O'Reilly Auto Parts #6481 (SL3)
New Construction - 7,844 SF
Post-Bid
$500,000 to $900,000 est. value
Summerville, SC 29483

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

2021 Resurfacing Project
Infrastructure
Results
$761,054 est. value
North Charleston, SC

Paving Solicitor's and Sheriff's Parking Lot
Alteration
Results
Saint George, SC 29477

AutoZone #1600
Renovation - 8,000 SF
Construction
$500,000 to $750,000 est. value
Saint George, SC 29477

Enterprise Bank
New Construction - 3,191 SF
Construction
$500,000 to $1,000,000 CJ est. value
Ridgeville, SC 29472

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Summerville, SC 29485

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

Last Updated 11/16/2022 09:30 AM
Project Title

Sawmill Mixed Use Future Phases

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bank, Food/Beverage Service, Hotel/Motel, Office, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Total cost listed is at full development. 57 Acre Mixed Use remaining portions: Retail, Office, Restaurant, hotel, and financial institute. Construction will begin early to mid 2023 on the Apartments see project; "Sawmill Apartments" Construction is set to begin early 2023 on the Hospital see project; "Roper St. Francis Outpatient Facility at Sawmill". As of November 16, 2022, the developer announced land clearing has begun. Information regarding architect and contractor for the phased development has yet to be announced. A firm construction timeline has not been set, however construction is not expected to begin prior to late 2023.

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware, Special Function Hardware, Mirrors, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Specialty Casework, Bank Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents