Biomanufacturing Plant / Scorpion Biological Services
New Construction, Infrastructure - 500,000 SF
Design
$650,000,000 CJ est. value
Manhattan, KS 66502

2023 MHA Lawn Care (Mowing)
Term Contract
Design
Manhattan, KS 66502

RFP D/B - CiCo Park improvements
Infrastructure
Bidding
$191,000 CJ est. value
Manhattan, KS 66502

RFQ Design - Design of EMS Station
New Construction, Infrastructure
Post-Bid
$11,000,000 CJ est. value
Manhattan, KS 66502

Bus Shelter Project
New Construction, Infrastructure
Post-Bid
Manhattan, KS

2021 - 2022 Sidewalk Repairs & Improvements
Infrastructure
Results
Lenexa, KS

Pedestrian and Bicycle Paths
Infrastructure
Results
KS

Autumn Ridge Addition
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Manhattan, KS 66503

Asphalt Overlay Improvements
Infrastructure
Post-Bid
$500,000 est. value
Randolph, KS

Milling and HMA Overlay
Infrastructure
Results

Wastewater Treatment Plant Solids Treatment Upgrade and Expansion Project
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Manhattan, KS 66502

1200 Block Alley
Infrastructure
Results
Manhattan, KS

Tuttle Creek Dam Service Gate 1 and 2 Steel Liner Repairs
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Manhattan, KS 66502

Claflin Road Pedestrian Improvements
Infrastructure
Results
Manhattan, KS 66502

Tropical Smoothie / Manhattan
New Construction, Infrastructure - 1,166 SF
Post-Bid
$1,000,000 CJ est. value
Manhattan, KS 66502

Last Updated 07/12/2023 09:32 PM
Project Title

Manhattan Ave, Campus Creek Rd., & Bayberry Ln. Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Manhattan, KS 66502   (Riley County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project is infrastructure improvements to North Manhattan Avenue, Campus Creek Ave, and Bayberry Ln in Manhattan Kansas. New traffic signals are to be installed at the intersection of North Manhattan Avenue to Bertrand, Thurston, Vattier, and modified at Bluemont. Portions of the existing connecting streets located on KSU's campus will be realigned for a new roundabout installed west of a new intersection at Bertrand Street. This project includes but is not limited to asphalt mill and overlay (2626 SY), concrete safety barrier (~300 LF), roadway construction (~6000 SY), sidewalk construction (~15,000 SF), campus creek stabilization (350 LF), and reinforced concrete box construction ((2)-7'x4', 230 CY). Questions concerning this bid can be directed to Paul Moore PE, Olsson, pmoore@olsson.com or by phone, (913) 381-1170. Bid(5%), Performance, Maintenance, Certified Check

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans