Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

Hays Center HVAC Upgrade
Renovation
Sub-Bidding
$25,000 CJ est. value
Champaign, IL 61821

High School New Cooler / Freezer Project
Renovation
Sub-Bidding
$400,000 CJ est. value
Mahomet, IL 61853

Hail Damaged HVAC Equipment Replacement
Infrastructure
Post-Bid
Urbana, IL 61802

Replacement of Rooftop HVAC Units
Alteration
Post-Bid
Chicago, IL 60612

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Des Plaines HVAC Improvements
Results
Des Plaines, IL

Central Community Center - RTU Replacement (Units 6, 8, 11)
Alteration
Post-Bid
Mount Prospect, IL 60056

Morton College Building E - HVAC
Renovation
Results
Less than $100,000 est. value
Cicero, IL 60804

ABB HVAC Drives
Alteration
Post-Bid
IL

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

HVAC Supply House
Alteration
Post-Bid
IL

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

J043--Compressor Maintenance
Term Contract
Post-Bid
Hines, IL 60141

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

Last Updated 12/20/2022 04:33 PM
Project Title

Air Conditioning Equipment Work at the Fulton County Courthouse

Physical Address View project details and contacts
City, State (County) Lewistown, IL 61542   (Fulton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $92,930 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract Documents, including plans, specifications, instructions to bidders and proposal forms may be examined at the office of: Graham and Hyde Architects, Inc. 344 West Chestnut, Canton, Illinois 61520 Proposals shall be accompanied by Bid Guarantee in form of a Bid Bond for 5 percent of the gross amount of the bid, made payable as described in the Contract Documents. Such bid bond shall be forfeited as liquidated damages by the Bidder should he fail to enter into a contract and furnish a satisfactory performance bond within the following number of days: 10 after notification of acceptance of his proposal. The bid bonds of all excepting the three lowest formal bidders will be returned within the following number of days after bid opening: 7 and the remaining bid bonds will be returned within the following number of days after bid opening: All proposals must be made on forms furnished by the architect. No bid may be withdrawn after scheduled closing time for the receipt of bids for at least this number of calendar days: 30 The Owner reserves the right to reject any and all bids and to waive any informalities in bidding. All work performed on this project shall comply with Illinois Statutes concerning payment of prevailing wages. For bids in excess of $100,000, Bidder and subcontractors for this work must comply with the Fulton County Responsible Bidder Ordinance establishing criteria for determination of a responsible bidder for County construction projects. All contractors and subcontractors shall comply with Illinois Statutes concerning mandatory drug testing for all workers on this project. (Signed) Chairman, Fulton County Board Fulton County, Illinois .

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents