Similar Projects
Stone Mountain Highway Townhouses
New Construction, Infrastructure
Conception
$56,000,000 CJ est. value
Lilburn, GA 30047

City Farmers Market Expansion
Addition, Infrastructure - 1,570 SF
Conception
Snellville, GA 30039

Circle K - Lawrenceville Hwy / Lawrenceville
New Construction, Infrastructure - 6,000 SF
Design
$1,400,000 CJ est. value
Lawrenceville, GA 30044

Lidl #1476 / Sugar Hill
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Sugar Hill, GA 30518

Kroger #GA639 / Lawrenceville
Demolition, New Construction, Infrastructure - 118,314 SF
Bidding
$32,000,000 CJ est. value
Lawrenceville, GA 30045

Kroger #GA639 / Lawrenceville
Demolition, New Construction, Infrastructure - 118,314 SF
Bidding
$32,000,000 CJ est. value
Lawrenceville, GA 30045

Gwinnett Place Mall Redevelopment - Gwinnett County
Demolition, New Construction, Term Contract, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Duluth, GA 30096

LiDL #1517 / Norcross - Rebid
New Construction, Infrastructure - 31,109 SF
Post-Bid
$5,000,000 CJ est. value
Norcross, GA 30093

Destination Park Sidewalk, Utility, and Site Improvements
New Construction, Infrastructure
Results
Loganville, GA

2021 LMIG Paving Project
Infrastructure
Results
$378,334 CJ est. value
Loganville, GA 30052

Huyen Khong Buddhist Temple
New Construction - 9,000 SF
Construction
$1,250,000 est. value
Lawrenceville, GA 30045

Ivy Creek Baptist Church
Addition
Construction
Buford, GA 30519

Centerville Highway Self Storage Facility
New Construction, Infrastructure - 99,960 SF
Pending Verification
$10,800,000 CJ est. value
Snellville, GA 30039

Sweetgum Road Townhouses
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Lawrenceville, GA 30045

Hamilton Mill Commercial Development
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Buford, GA 30519

Last Updated 02/21/2023 01:24 PM
Project Title

Faith Free Full Gospel Church Addition

Physical Address View project details and contacts
City, State (County) Buford, GA 30518   (Gwinnett County)
Category(s) Heavy and Highway, Religious/Funeral
Sub-Category(s) Religious Facility, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The square footage after the addition is complete has not been announced. As of February 21, 2023, building plans have been approved with Gwinnett County. Information regarding an architect or general contractor has not been disclosed. Although there is not a firm timeline has not been announced, construction could begin in second quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,320 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents