Similar Projects
Swing Check Valves Repair - Utilities
Post-Bid
Largo, FL 33778

Equipment Calibration, Repair, and Replacement - Utilities
Post-Bid
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

SR-580 Water Main Tie-Ins
Results
Less than $341,286 est. value
Dunedin, FL 34698

Force Main 8 Replacement
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Water Main Improvements at ALT US 19 to Omaha Street Delaware Avenue to Nebraska Avenue (PID 004017A)
Results
Less than $1,399,413 est. value
Palm Harbor, FL 34683

Utility Locate Services
Infrastructure
Post-Bid
Clearwater, FL

Espiritu Santo Springs and Washington Brennan Subdivisions Water Main Replacement Project
Results
Less than $1,890,000 est. value
Safety Harbor, FL

County Road 95 Force Main Replacement and Relocation
Infrastructure
Post-Bid
$814,985 est. value
Clearwater, FL

Shore Acres Water Main Replacement
Results
$1,600,000 est. value
Saint Petersburg, FL 33731

Philippe Pointe Pedestrian Bridge Water Main Project
Infrastructure
Post-Bid
$565,000 est. value
Safety Harbor, FL

Utility Rehabilitation and Construction Services
Term Contract
Results
Tarpon Springs, FL 34688

Philippe Pointe Pedestrian Bridge Water Main Project
Infrastructure
Post-Bid
Safety Harbor, FL

Construction of Harbor Palms Infrastructure Project Phase 2
Results
Oldsmar, FL

Coating of 36 Inch Wtm; Restoration of Potable/Reclaimed Water Mains
Results
Saint Petersburg, FL

Last Updated 09/29/2021 06:55 AM
Project Title

Armour Drive and Mangrum Drive Water Main Replacement

Physical Address View project details and contacts
City, State (County) Dunedin, FL 34698   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of new PVC water main with all valves, fittings, hydrants and appurtenances; the abandonment of the existing water main; installation of new underdrain

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents