Similar Projects
2022 CIPP Rehabilitation Project Prequalification
Infrastructure
Bidding

Construction of the Jordan River Siphon and District Outfall Line Project
Infrastructure
Post-Bid
Salt Lake City, UT

Storm Drain Lining Project
Infrastructure
Post-Bid
Millcreek, Salt Lake City, South Salt Lake, UT 84115

Lone Peak Elementary Storm Drain Upgrade
Results
Sandy, UT 84092

800 West - 600 South to 800 South
Results
Less than $7,925,018 est. value
South Jordan, UT

South Salt Lake City 900 West 2100 South to 3300 South Catch Basin Grate Replacement (East Side)
Infrastructure
Post-Bid
Salt Lake City, UT 84104

New West Jordan MS4
Results
West Jordan, UT 84081

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Stormwater Receiving Station
Results
Less than $598,400 est. value
Salt Lake City, UT 84104

Replacement of Existing Catch Basin Grates
Results
$50,000 to $60,000 est. value
South Salt Lake, UT 84119

Storm Drain Lining
Results
$50,000 to $60,000 est. value
South Salt Lake, UT

Stormdrain Control Valve Project
Results
Less than $60,000 est. value
South Salt Lake, UT

PCC Pavement Joint Seal Program North Cargo Apron Phase 2
Results
Less than $372,767 est. value
Salt Lake City, UT 84122

Welby Pump Station Canal Turnout and Storm Drain Sleeve
Results
South Jordan, UT

Tecumseh Storm Drain Project
Results
$209,335 est. value
West Valley City, UT

Last Updated 02/09/2022 06:03 AM
Project Title

8600 South Sewer and Water Project

Physical Address View project details and contacts
City, State (County) West Jordan, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises the construction of a new 15-Iinch PVC sewer pipe and connecting to an existing 15-inch PVC sewer pipe, a new casing under the MVC, and associated sewer manholes. This work will include sewer line, manhole replacement as well as bypass pumping, groundwater control, and surface restoration of existing improvements damaged by construction including but not limited to asphalt, concrete curb, concrete sidewalk, clearing and grubbing, and fencing removal and replacement. Also required is the construction of approximately 2,960 feet of a new 12-inch PVC waterline, fire hydrants, valves, testing and commissioning, and all appurtenant work. The Work to be constructed is located along 8600 South from approximately 5600 West to 6000 West in West Jordan, UT.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents