Similar Projects
FSRs 31, 33, and 38 Road Maintenance Services
Infrastructure
Bidding
Everett, WA

SR 96, North Creek Fish Passage
Infrastructure
Bidding
$2,500,000 to $3,000,000 est. value
Mill Creek, WA 98082

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

Small Works Roster - Avenue NE Storm Repair - Phase One
Infrastructure
Post-Bid
Arlington, WA 98223

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

2022 Utility and Pavement Preservation Project
Infrastructure
Bidding
$3,400,000 est. value
Arlington, WA 98223

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Parkway Schools Concrete Overlay Projects
Infrastructure
Bidding
$400,000 est. value
Everett, WA

Warm Beach Water System Water Replacement
Infrastructure
Post-Bid
$2,000,000 est. value
Stanwood, WA 98292

172nd Street NE & 40th Avenue Signal and Median Improvements
Infrastructure, Alteration
Results
$1,846,000 est. value
Arlington, WA 98223

SR18 Et AL, Northwest Region HMA Crack Seal and Pavement Repair
Infrastructure
Bidding
$2,000,000 to $2,500,000 est. value
Covington, WA 98042

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Last Updated 06/16/2022 02:45 AM
Project Title

Madison Combined Sewer Separation

Physical Address View project details and contacts
City, State (County) Monroe, WA   (Snohomish County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for the separation of the combined sewer along Madison Street from Main Street to Elizabeth Street to include reconstruction of the road to provide proper drainage, replacement of an old AC watermain, construction of infiltration facilities, replacement of curb, gutter and sidewalk, installation of water quality treatment units, all in accordance with the attached Contract Plans, these Contract Provisions and the Standard Specifications. The project area potentially contains archaeological or historical objects that may have significance from a historical or scientific standpoint. The Contractor shall conduct its operations in a manner that will accommodate such activities, including the reserving of portions of the work area for site testing, exploratory operations and recovery and removal of such objects as directed by the Engineer. All excavation work shall be bid under the assumptions that the top 3 feet of soil shall be excavated in 4-inch to 6-inch lifts. This cost shall be included in the unit price for 'Roadway Excavation incl. Haul'. This is a fast-track project. The project will be awarded by June 28, 2022 with the pre-construction conference scheduled for July 11, 2022 and the Notice to Proceed is to be issued by July 18, 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents