Similar Projects
Carvana
New Construction - 200,000 SF
Conception
$23,000,000 est. value
Lorain, OH 44053

Hara Arena Site Redevelopment
New Construction, Demolition
Conception
Trotwood, OH 45415

Streetsboro 43 and Frost
New Construction
Design
Streetsboro, OH 44241

Streetsboro 43
New Construction
Design
Streetsboro, OH 44241

Redevelopment of Hollister Development Site
Infrastructure
Bidding
Cincinnati, OH

Water Distribution Repairs and Site Improvements - CM at Risk
Infrastructure
Bidding
$8,000,000 est. value
Leavittsburg, OH 44430

WMC Loading Dock Expansion and Renovation
Renovation
Post-Bid
Columbus, OH

Station-Based Bikeshare System Components
New Construction, Term Contract
Post-Bid
$625,000 est. value
Cincinnati, OH 45202

Redevelopment of 1626-28 Pleasant Street
Results
Cincinnati, OH 45202

A Bus Facility for: Circleville City School District (Site Development Only)
Results
Circleville, OH 43113

The Madison Road Streetscape
New Construction
Construction
Cincinnati, OH 45227

Cottonwood Demolition And Site Development
New Construction
Construction
Cincinnati, OH

WAKT 106.1FM Radio Tower
New Construction
Pending Verification
Toledo, OH 43609

Meilke Marina West Campground Expansion
New Construction
Conception
Curtice, OH 43412

Northgate Development
New Construction, Demolition
Design
$18,500,000 est. value
Wooster, OH 44691

Last Updated 06/29/2021 04:30 PM
Project Title

Port Clinton Coastal Access Plan

Physical Address View project details and contacts
City, State (County) Port Clinton, OH 43452   (Ottawa County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

First phase will include a $2.2 million steel break wall along the pier and the second phase could include expanding the dockage from seven boat slips to 50 or reconfiguring the pier's parking lot to include trees and lakeside seating.

Details

Site Development, New Construction, Dock/Pier, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Pier Construction.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings.
Division 09 - Finishes, Tiling.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Lockers.
Division 26 - Electrical, Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Access Control, Security Access Detection.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents