Similar Projects
U-Haul - East Broad Street / Statesville
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Statesville, NC 28625

U-Haul - East Broad Street / Statesville
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Statesville, NC 28625

Bestco Manufacturing Expansion
New Construction, Renovation, Infrastructure - 230,000 SF
Design
$177,000,000 CJ est. value
Mooresville, NC 28115

Bestco Manufacturing Expansion
New Construction, Renovation, Infrastructure - 230,000 SF
Design
$177,000,000 CJ est. value
Mooresville, NC 28115

Statesville Campus - Main Parking Lot Asphalt Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Statesville, NC 28677

Statesville Campus - Main Parking Lot Asphalt Replacement
Infrastructure
Bidding
$800,000 CJ est. value
Statesville, NC 28677

I-77 Ramp Resurfacing and Reconstruction Project
Alteration
Post-Bid

Road Repair Project
Infrastructure
Post-Bid
Love Valley, NC

Phase II Mill Village Improvements Project - Charlotte Street Improvements
Infrastructure
Results
Mooresville, NC 28115

Milling, Resurfacing, Pavement Markings and Markers.
Infrastructure
Results
NC

Sherwin-Williams Distribution Center
Addition, New Construction, Infrastructure - 836,000 SF
Construction
$324,000,000 CJ est. value
Statesville, NC 28625

Sherwin-Williams Distribution Center
Addition, New Construction, Infrastructure - 836,000 SF
Construction
$324,000,000 CJ est. value
Statesville, NC 28625

Sherwin-Williams Expansion
Addition - 236,000 SF
Pending Verification
Statesville, NC

Sheetz - Old Mocksville Road / Statesville
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Statesville, NC 28625

New Elevated Water Storage Tank - City of Mooresville
Infrastructure
Conception
$4,545,000 CJ est. value
Mooresville, NC 28115

Last Updated 01/05/2023 12:32 PM
Project Title

CR Onsrud Manufacturing Expansion

Physical Address View project details and contacts
City, State (County) Troutman, NC 28166   (Iredell County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $17,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of two buildings. As of January 5, 2023 construction is underway. Information regarding the architect has not been disclosed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, 9,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents