Similar Projects
RR-21-4579 Systemwide Roadway Appurtenance Repairs
Bidding
Downers Grove, IL

Mack Road Multi-Use Path and Bridge Reconstruction
Post-Bid
$250,000 to $500,000 est. value
Warrenville, IL 60555

Ceratech Fast-Setting Cement
Post-Bid
Lisle, IL

Gregory Avenue and Somerset Drive Reconstruction
Results
$1,081,025 est. value
Glendale Heights, IL 60139

2020 Paving
Results
$196,500 est. value
Wheaton, IL 60189

Devon-Park-Pierce Intersection Improvements
Pending Verification
Itasca, IL 60143

Poly Fiber Firm Asphalt Crack Sealant Material
Post-Bid
Downers Grove, IL 60515

Mack Road Trail Extension at St. James Farm Forest Preserve
Results
Less than $357,500 est. value
Wheaton, IL 60189

Crack Sealing Bituminous Pavement
Term Contract
Post-Bid
Addison, IL 60101

Salt Creek Greenway Trail Pedestrian Bridge Steel Repair
Results
Wood Dale, IL 60191

20-110 Hot-Mix Asphalt Surface Removal
Term Contract
Post-Bid
Wheaton, IL 60187

2020 GM Roads Program
Results
Downers Grove, IL 60187

I-20-4722 Bridge Construction O`Hare To Westbound Il Rt 390 Ramp
Post-Bid
Less than $10,000,000 est. value
Downers Grove, IL 60515

95th Street Library Parking Lot Mill and Overlay Services
Renovation
Results
Naperville, IL 60564

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

Last Updated 11/15/2021 02:04 PM
Project Title

Park Avenue West Bridge/Pavement Joint Repair

Physical Address View project details and contacts
City, State (County) Clarendon Hills, IL 60514   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repair of the Park Avenue West Bridge Expansion Joint at the Park Avenue West Bridge; Westbound Expansion Joint. This work shall consist of designing, producing and constructing Warm Mix Asphalt (WMA) in lieu of Hot Mix Asphalt (HMA)

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents