Similar Projects
Full Depth Reclaim, Mill and Overlay and Bridge Replacement
Renovation, Infrastructure
Conception
$8,100,000 est. value
MN

Fond du Lac Water System Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Cloquet, MN 55720

Fond du Lac Water System Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Cloquet, MN 55720

North Smoky Hills Graveling
Renovation
Post-Bid

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Regional Drinking Water Project Contract A - Wells 7 and 8 Construction
Renovation - 156,816 SF
Results
Cloquet, MN 55720

CSAH 5 (University Road) Mill, Bituminous Surface
Results
MN 55720

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

CSAH 7 FDR, Bituminous Surfacing and HSIP
Results
MN

Rodgers Lake Road Extension 21
Infrastructure
Post-Bid
MN

CSAH 3 (14th Street) Reconstruction
Results
Cloquet, MN 55720

CSAH 3 (14th Street) Phase II
Infrastructure
Post-Bid
Cloquet, MN 55720

District Wide Bituminous Seal Coat
Results

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Willard Munger State Trail, Mills Road Junction
Results
Moose Lake, MN

Last Updated 08/30/2022 11:17 AM
Project Title

Carlton Pump Station Reconstruction

Physical Address View project details and contacts
City, State (County) Carlton, MN 55718   (Carlton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $5,641,750 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes construction of a new pump station at the existing Carlton Pump Station site in Carlton, Minnesota. Project includes demolition of the existing facilities, including a wet-pit/dry-pit, installation of new valve vault, wet well, 24-inch diameter sanitary sewer, maintenance holes, prefabricated buildings, surge tank, temporary conveyance of wastewater, erosion control, pavement removal and restoration as indicated in the Contract Documents. A bidders failure to attend the pre-bid conference meeting shall cause any bid submitted by that bidder to be deemed non-responsive and will cause such bid to be returned unopened. Contact WLSSD at 218-722-3336 for printed contract documents. Starting February 1, 2022, an alternative means to disseminate public notices for bids and RFPs may be found at the WLSSD website business/bids-proposals as provided by Minnesota Statute 331A.03." After the 6 months has passed, the public notices will no longer be published and will be available only on the website. During the Mandatory Pre-bid Conference, Prospective Bidders Will Have the Opportunity to Ask Questions Relating to Bidding or Constructing the Work Under This Contract. If Deemed Appropriate by the Engineer, Questions That Cannot Be Addressed by Direct Reference to the Bidding Documents Will Be the Subject of an Addendum Issued to All Plan Holders. A Bidders Failure to Attend the Pre-bid Conference Meeting Shall Cause Any Bid Submitted by That Bidder to Be Deemed Non-responsive and Will Cause Such Bid to Be Returned Unopened. EPC# 21G1569

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents