Similar Projects
Boiler Replacements at Pennell School - 6340 - School District of Philadelphia
Alteration
Conception
$376,433 est. value
Philadelphia, PA 19141

USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Relocate and Reinstall Trailers and Modular Buildings
Renovation, Alteration
Bidding
$300,000 est. value
Philadelphia, PA

NAVFAC Design Build Replace Emergency/Exit Lights Buildings. 20, 546, 592 and 1029
Renovation
Bidding
$500,000 est. value
Philadelphia, PA 19112

Air Conditioning Units
Term Contract
Sub-Bidding
Philadelphia, PA 19102

Appliances
Term Contract
Sub-Bidding
Philadelphia, PA 19102

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

HVAC and Mechanical Products
Term Contract
Post-Bid

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

JOC Order Contracting Region A
Results
$10,000,000 est. value

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Fts 812(L) Reil Voltage Driven
Term Contract
Sub-Bidding
Philadelphia, PA 19102

Bldg. 592 Mezzanine Ventilation Design & Installation
Post-Bid
$500,000 to $1,000,000 est. value
Philadelphia, PA

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Last Updated 07/28/2022 09:40 AM
Project Title

Water Cooler 3 GAL

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19102   (Philadelphia County)
Category(s) Government/Public, Single Trades
Sub-Category(s) HVAC, Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Water Cooler 3 GAL

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents