Similar Projects
Last Updated | 11/17/2020 10:28 AM |
Project Title | Elevator Designs for Hart Middle School, Malcolm X at Green, Burroughs Educational Campus, Langley Elementary School and Tyler Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20018 (District of Columbia County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The design team shall be expected to provide turnkey activities for this project, resulting in a finished, fully usable design that satisfies all project requirements and contract terms. The design team engaged through this procurement shall be required to provide a full range of planning, design, architectural and engineering services through construction administration and close-out to fully design and support construction of a new elevator. Pre-Proposal Meeting and Site Visit on 07/24/2019 at 10:30 AM at Malcolm X at Green, 1500 Mississippi Avenue, SE Washington, D.C. 20032 and on 07/25/2019 at 9:00 AM at Burroughs Educational Campus, 1820 Monroe Street, NE Washington, D.C. 20018 and on 07/25/2019 at 10:30 AM at Langley Elementary School, 101 T Street, NE, Washington, D.C. 20002 and on 07/25/2019 at 12:00 PM at Tyler Elementary School, 1001 G Street, SE Washington, D.C. 20003 |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |