Similar Projects
O'Reilly Auto Parts (BS6)
New Construction - 6,800 SF
Conception
$500,000 to $900,000 est. value
Boise, ID

Mixed Use Planned Residential
New Construction - 11,000 SF
Conception
$1,000,000 to $5,000,000 est. value
Boise, ID 83704

O'Reilly Auto Parts (STR)
New Construction - 6,800 SF
Design
$500,000 to $900,000 est. value
Star, ID

North 4th Street Mixed Use Development
New Construction
Design
Boise, ID 83702

Walmart 0-3--TENANTBID--2021 - Bundle #3
Renovation
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Walmart Supercenter #2862-249 - Rm-1
Renovation - 206,347 SF
Construction
Less than $1,676,254 est. value
Meridian, ID 83642

Walmart Supercenter #2861-247 - D9 Gun Removal
Renovation - 20,205 SF
Construction
$8,517 est. value
Garden City, ID 83714

16th & State Multifamily Development
New Construction
Pending Verification
Boise, ID 83702

Downtown Boise Revamp Projectr
Renovation - 98,000 SF
Pending Verification
$180,000,000 est. value
Boise, ID 83702

917 S. Lusk St. Apartments
New Construction, Demolition
Conception
Boise, ID 83706

Verve Boise Mixed Use Development
New Construction - 308,650 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Boise, ID 83706

Bodo Block Food Hall
Renovation - 100,000 SF
Construction
$10,000,000 to $20,000,000 est. value
Boise, ID 83702

Walmart Supercenter #2861-277 - D8 Pet Cooler
Renovation - 202,054 SF
Design
Garden City, ID

Walmart Supercenter #5841-228 - SPRB-R
Renovation - 158,848 SF
Construction
$2,202,417 est. value
Meridian, ID 83646

Reported 05/09/2022 06:22 PM
Project Title

Albertson's #3337

Physical Address View project details and contacts
City, State (County) Kuna, ID 83634   (Ada County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method
Project Status Construction Commenced April 2022
Bids Due View project details and contacts
Estimated Value $75,296
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, 1 Story Above Grade, 34,456 SF Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents