Similar Projects
Van Nuys and Voss Mixed Use Development
New Construction, Infrastructure, Alteration - 86,550 SF
Design
Los Angeles, CA 91405

Valley Day-Use Parking Phase II
Alteration
Design
$3,000,000 to $5,000,000 est. value
CA

Mccoy Creek Trail Phase 2 Improvements
Infrastructure
Bidding
$3,200,000 est. value
Suisun City, CA

Bear Creek and Pixley Slough Bicycle and Pedestrian Path
Infrastructure
Bidding
Less than $2,300,000 est. value
Stockton, CA

De Anza Park Pathway Renovation
Infrastructure
Post-Bid
$546,000 est. value
Sunnyvale, CA 94087

2021 Pavement Rehabilitation
Alteration
Post-Bid
$500,000 est. value
Ross, CA 94957

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Marin County Jail Booking Area Barrier Removal for ADA Compliance
Infrastructure
Results
$159,249 est. value
San Rafael, CA 94903

Construct New Parking Lot
Alteration
Design
$500,000 to $1,000,000 est. value
Dublin, CA 94568

Curb, Gutter, and Sidewalk Maintenance
Alteration
Bidding
Los Gatos, CA

Parking Pay Station Site Improvements Lot J
Infrastructure
Post-Bid
$20,000 est. value
Rohnert Park, CA 94928

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Sidewalk Curb and Gutter Repairs Program
Infrastructure
Bidding
$1,300,000 est. value
Stockton, CA 95202

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

PW Various Locations No - 50 Infrastructure Improvements
Infrastructure
Results
$3,000,000 est. value
San Francisco, CA

Reported 03/10/2022 12:00 AM
Project Title

Trip Hazard Removal of Raised Sidewalk

Physical Address View project details and contacts
City, State (County) Hayward, CA   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To identify tripping hazards caused by concrete sidewalk offsets between the heights of 1/2 inch to 1-1/2 inches, and removing the tripping hazards by grinding or saw cutting of the concrete sidewalk panel offsets, and doing all appurtenant work in place and ready for use

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents