Similar Projects
MLK Streetscapes - City of Auburn
Infrastructure
Conception
$5,155,950 CJ est. value
Auburn, AL 36832

RV Roadway of Opelika Service Building
New Construction, Infrastructure - 11,250 SF
Conception
$3,000,000 CJ est. value
Opelika, AL 36801

Parker Creek Townhomes
New Construction, Infrastructure
Design
$5,280,800 CJ est. value
Auburn, AL 36832

Jay and Susie Gogue Performing Arts Center - Auburn University
Addition, Demolition, Infrastructure
Design
$5,000,000 CJ est. value
Auburn, AL 36832

STEM and Agricultural Sciences Complex New Facility
New Construction, Infrastructure - 265,000 SF
Bidding
$36,000,000 CJ est. value
Auburn, AL 36830

Kreher Preserve and Nature Center Environmental Education Building
New Construction, Infrastructure
Bidding
$331,000 CJ est. value
Auburn, AL 36830

Multi-Use Path Along Martin Luther King Drive
Infrastructure
Post-Bid
Auburn, AL 36832

Quad Residence Halls and Quad Drive - Infrastructure and Accessibility Improvements
Infrastructure
Post-Bid
Auburn, AL

Facilities Management Training Center - New Facility
New Construction, Infrastructure - 9,600 SF
Results
$2,071,279 CJ est. value
Auburn Univ, AL 36849

Swingle Hall - New ADA Ramp and Other Accessibility Improvements
Infrastructure
Results
Auburn, AL 36849

Graduate Hotel / Auburn
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Auburn, AL 36830

Cannon Gate
New Construction - 1,300 SF
Construction
Opelika, AL 36801

National Chain Retail Store - Reveille's Outpost / Auburn
New Construction, Infrastructure - 9,500 SF
Pending Verification
$2,000,000 CJ est. value
Auburn, AL 36832

Son's Ford Parking Lot
Infrastructure
Pending Verification
Auburn, AL

North College Street Railroad Crossing Sidewalk - City of Auburn
Infrastructure
Conception
$400,000 CJ est. value
Auburn, AL 36830

Last Updated 02/22/2023 03:31 AM
Project Title

Lighting Improvements Project for South College Street, Samford Avenue, and Gay Street In Auburn

Physical Address View project details and contacts
City, State (County) Auburn, AL 36830   (Lee County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $630,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

122-B Tichenor Avenue, for furnishing all labour, materials and equipment necessary for the completion of the following projects: LIGHTING IMPROVEMENTS PROJECT FOR SOUTH COLLEGE STREET, SAMFORD AVENUE, AND GAY STREET IN AUBURN, AL The work will consist principally of the following items: ITEM DESCRIPTION UNIT QUANTITY Furnishing and Installing Decorative 8.0' Tall Pedestrian Light Pole with Bronze Finish and LED Fixture Installed on Top of Retaining Wall EA 12 Installing Decorative 12.0' Tall Pedestrian Light Pole with Black Finish and LED Fixture EA 18 Installing Decorative 12.0' Tall Pedestrian Light Pole with Black Finish, LED Fixture, and Receptacles EA 13 Furnishing and Installing Decorative 30.0' Tall Street Light Pole With Single Mast Arm, Black Finish, LED Fixture, and Receptacles EA 3 Furnishing and Installing Decorative 30.0' Tall Street Light Pole with Double Mast Arms, Black Finish, LED Fixtures, and Receptacles EA 5 Furnishing and Installing New Electrical Panel EA 2 Plans, specifications, and contract documents are available for viewing, free of charge. At least five percent (not to exceed $10,000) of the amount bid in the form of a certified or cashier's check or bid bond payable to the City of Auburn, Alabama. All bidders are required to be compliant with the Beason-Hammon Alabama Taxpayer and Citizen Protection Act, Act No. 2011-535 (Code of Alabama (1975) 31-13-9) as amended May 16, 2012 regarding employment practices. The successful low bidder is responsible for acquiring the appropriate business licenses and permits to conduct work within the City of Auburn. Your attention in particular is invited to the section entitled "Instructions to Bidders", which is to be followed in all respects. The City reserves the right to select the lowest responsible bidder as the best interest of the City may require, to award the purchase contract from any of the bids, to reject any and all bids, and to waive any informalities in bids received. Bids will be good for thirty (30) days after being opened by the City of Auburn, Alabama.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents