Similar Projects
Multi-Purpose Sport Flooring at Horizon Middle School
Bidding
Kissimmee, FL 34746

Office Flooring Removal and Replacement
Bidding
Tampa, FL

Neal Armstrong Elementary School - Kitchen Floor Replacement
Sub-Bidding
Port Charlotte, FL 33952

2019 Gym Floor Refinish and Restoration
Post-Bid
Tampa, FL 33610

M.C Blanchard Judicial Building Carpet Replacement
Post-Bid
Pensacola, FL 32502

Public Safety Building Repairs
Results
Less than $10,100 est. value
Callaway, FL 32404

Replace the Flooring for the Wewahitchka High School Commons Area
Results
Wewahitchka, FL 32465

Raised Flooring System with Carpet
Bidding
Hurlburt Field, FL

Community Center - Flooring
Post-Bid
Port Saint Lucie, FL 34984

Replacement of Volusia County Fire Stations Concrete Floor Coatings
Results
Less than $32,895 est. value
De Land, FL 32720

Pahokee High School Gymnasium Floor Replacement
Bidding
Pahokee, FL 33476

Regional Park Aquatics Lifeguard Room Flooring
Post-Bid
Miramar, FL 33025

District Energy System (DES) Floor Resurfacing
Results
Jacksonville, FL 32202

Floor and Carpet Care Services
Bidding
Gainesville, FL

Halifax Health Port Orange Hospital Flooring
Post-Bid
Port Orange, FL 32127

Last Updated 10/19/2020 11:54 AM
Project Title

The Federal Aviation Administration (FAA) has a requirement for the removal and replacement of the existing vinyl composite tile (VCT) and carpet from the PIE Base located At the St. Petersburg International Airport Air Traffic Control Tower.

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33762   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000 to $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall remove and replace the existing vinyl composite tile (VCT) and carpet from the PIE Base Building. The contractor shall remove and replace the wall base and edge guards/transition accessories. The contractor provide the appropriate no or low VOC adhesives for the materials to be installed. The specific rooms and corridors that the work is to be performed and the type of flooring to be installed are identified in Figures 1 (refer to Appendix A). Table 1 identifies estimated square footage and linear footage within the work area. Specification Sections 09 65 13, 09 65 19 and 09 68 13 are included in Appendix A.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents