Similar Projects
Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

Construction Manager At Risk - Project Approach
Renovation
Post-Bid
$1,625,000 est. value
Topeka, KS

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

Turkey Creek WWTF Miscellaneous Improvements
Renovation
Results
Mission, KS 66202

2022 Wastewater Treatment Facility Improvements
Renovation
Results
$2,601,500 est. value
Osawatomie, KS 66064

On Call Contractor Services for Treatment Plant
Term Contract
Post-Bid
Wichita, KS

Water Treatment West Plant Basin Rehabilitation
Renovation
Results
Topeka, KS 66606

SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

Wastewater Treatment Plant SCADA Controls & Instrumentation Maintenance NBAF
Renovation
Post-Bid
Manhattan, KS 66506

Reported 06/11/2022 12:00 AM
Project Title

Wastewater Treatment Plant Improvement Project Packages

Physical Address View project details and contacts
City, State (County) Salina, KS 67401   (Saline County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected November 2022
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Reconfiguration of the existing aeration basins, to provide biological nutrient removal capabilities. This includes new concrete walls and baffles, metal access platforms, air diffuser systems and mechanical mixing and pumping equipment. Associated piping, electrical and instrumentation/controls will also be required Provision of a new Final Clarifier, including the excavation and construction of a circular concrete basin, and installation of mechanical clarifier equipment. Associated buried piping and other ancillaries will also be required. Refurbishment of 3 existing clarifiers, extending to the replacement of component parts, repainting the scraper mechanisms and installing launder covers. Refurbishment of 2 Digesters, including the replacement of steel roofs, installation of linear motion mixers, re-coating of tank interior walls, and installation of new ancillary equipment, piping, electrical and instrumentation Construction of a new Boiler Building, a masonry building (approx. 1500 sq.ft.) housing new boilers, electrical and ancillary equipment Installation of chemical feed systems, gas flare, electrical equipment and other minor scope items at the facility.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents