Similar Projects
Palm Beach Shores Water Main Improvement Project
Bidding
Riviera Beach, FL 33404

Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Gravity Sewer Manhole and Cover, Purchase of
Post-Bid
West Palm Beach, FL 33415

Pipeline Cleaning Services
Term Contract
Post-Bid
West Palm Beach, FL 33415

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

J--Sanitary Sewage Lift Station
Results
West Palm Beach, FL 334106400

Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)
Bidding
Jupiter, FL 33458

Sanitary Sewer Collection System Rehabilitation
Post-Bid
FL

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

181st Street Neighborhood Gravity Sewer System
Post-Bid
Less than $250,000 est. value
Loxahatchee, FL

Water Main Improvements: 31st, 32nd, 33rd, 34th and 35th Streets
Results
West Palm Beach, FL

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

1 Million and 3 Million Storage Tanks Pressure Sustaining Valve Replacement
Results
Less than $135,000 est. value
Boynton Beach, FL 33425

Reclaimed Watermain for Area 10
Post-Bid
Delray Beach, FL

Reduced Pressure Principle Backflow Prevention Assemblies
Results
FL

Reported 07/30/2020 12:00 AM
Project Title

Pipeline Wet Tapping and Line Stop Continuing Construction Contract

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33416   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $5,500,000
Plans Available from County Agency - 06/30/20
Owner View project details and contacts
Architect View project details and contacts
Description

The bids are for furnishing all materials and/or installation services for wet tapping and line stopping of DIP/CIP/PVC/AC/PCCP potable water, reclaimed water and wastewater pipeline systems. The Contract is for a term of three years (36 months).

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents