Similar Projects
Construction of Grand Mission Regional Detention System Maintenance
Post-Bid
$600,000 est. value
TX

Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Harvey Disaster Recovery Repairs at the Clear Creek Bayou, Armand Bayou and Sims Bayou Watersheds
Results
Less than $1,195,000 est. value
TX

Police Training Facility - Berm Improvements
Construction
Less than $2,200,000 est. value
Conroe, TX 77301

Water, Sanitary Sewer, Drainage, and Paving Facilities for Sterling Lakes Drive Street Dedication
Post-Bid
TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

Harvest Meadows Phase Two - Water, Wastewater and Drainage Improvements
Post-Bid
Buda, TX 78610

Water, Sanitary Sewer, and Drainage Facilities, Paving and Appurtenances to Serve Mustang Trails Section 3
Results
Less than $1,636,000 est. value
TX

Sims Bayou Harvey Repairs, Harris County, Texas
Post-Bid
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Del Bello Section 1
Results
TX

Repair Seven (7) Drainage Pump Stations
Post-Bid
Port Arthur, TX

OP Schnabel Park Entrance and Bridge
Results
$783,000 est. value
San Antonio, TX

Seeling Channel Phase 3 Project
Post-Bid
$15,080,000 est. value
San Antonio, TX 78205

Bass Lodge Retaining Wall Repair at Daingerfield State Park
Results
$136,600 est. value
Daingerfield, TX 75638

Last Updated 05/26/2021 04:09 PM
Project Title

Hackberry Gully Regional Detention Facility East and Central Ponds

Physical Address View project details and contacts
City, State (County) Mont Belvieu, TX   (Chambers County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes (but is not limited to) construction of a 22-acre lake on the Hackberry Gully Regional Detention / Park Facility owned by the City, along with construction of an open channel connection to an existing lake on the site and construction of the regional detention facility outfall structure.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents