Similar Projects
Gow School Administrative Building
Demolition, New Construction, Infrastructure - 17,500 SF
Design
$3,730,000 CJ est. value
South Wales, NY 14139

ECC North Campus Sports Playing Fields
Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Williamsville, NY 14221

Renovate Parker Hall
Renovation
Bidding
$98,485,000 CJ est. value
Buffalo, NY 14202

Natural Sciences Complex (NSC) Classroom Renovations Phase 2
Renovation
Post-Bid
Buffalo, NY 14260

Natural Sciences Complex (NSC) Toilet Room Renovation
Renovation
Post-Bid
Buffalo, NY 14260

Buffalo Red Jacket Lounge Renovations including Hazardous Materials Abatement
Renovation
Results
$800,000 to $900,000 est. value
Amherst, NY 14261

Renovate Classroom Building - Demolition/Abatement/Envelope at Buffalo State
Renovation - 106,410 SF
Results
$15,000,000 to $20,000,000 est. value
Buffalo, NY 14222

SUNY ECC North Campus 2020 Kittinger Hall Window and Door Replacement
Renovation
Construction
Williamsville, NY 14221

Renovate Foster Hall
Renovation
Construction
$30,000,000 to $35,000,000 est. value
Buffalo, NY 14214

South Campus Dental Clinic - UB School of Dental Medicine
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Buffalo, NY 14214

New Academic Building / D'Youville University
New Construction, Infrastructure - 104,000 SF
Pending Verification
$50,000,000 CJ est. value
Buffalo, NY 14213

University at Buffalo Ellicott Welcome Center CM Build
Renovation - 24,000 SF
Post-Bid
$12,000,000 est. value
Buffalo, NY 14260

Rehabilitate Elevators in Various Buildings - Phase II
Renovation
Results
$2,500,000 to $5,000,000 est. value
Buffalo, NY 14260

Squire Hall - Renovate First Floor Clinics
Renovation
Post-Bid
Buffalo, NY 14214

NSC Level 05 Chemistry Lab Renovation
Renovation
Results
$48,616 CJ est. value
Buffalo, NY 14228

Last Updated 04/10/2023 12:25 PM
Project Title

Renovate Farber Second Floor

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14214   (Erie County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 10, 2023, this project is in design. A firm bidding and construction timeline has not been confirmed. *The closed solicitation has been included below for reference: The Health Sciences Complex (HSC) is composed of eight independent but inter-connected facilities. The facilities that comprise the complex are Cary, Farber, Sherman, Sherman Annex, Farber Annex, South Campus Chemical Storage Facility, Biomedical Research Building (BRB) and the Biomedical Education Building (BEB). Contained throughout these structures are classrooms, wet and dry research laboratories, clinical research laboratories, specialized teaching laboratories, departmental and administrative offices and shared support spaces for all units. In 2018, the Jacobs School of Medicine and Biomedical Sciences (JSMBS) opened downtown and vacated approximately 225,000nsf of space in the complex. The reuse of the complex is a key interim component of the implementation of UB's Comprehensive Physical Plan a major component of which we are calling the South Campus Revitalization Plan. This is a multi-phased project will involve improvements to educational, research and teaching spaces, the demolition of buildings, and restoration of landscapes across the campus. This will show a renewed commitment to the surrounding community in the aftermath of the JSMBS's departure. This project will relocate two departments of the School of Public Health & Health Professions (PHHP) from Kimball Tower onto the 2nd floor of Farber. Those departments are Community Health & Health Behavior (CHHB) and Public Health's Information Technology office. This project will also create space for Epidemiology and Environmental Health (EEH) to expand. Anticipated effective start date is 6/6/2022. Anticipated design completion date is 9/30/2022. Construction must be complete on July 7 of 2023. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 14% Women Owned Sub-Contracting Goal: 16% Service-Disabled Veteran-Owned Business Contracting Goal: 6% The method of Contractor Selection has not been Determined at this time

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents