Similar Projects
Last Updated | 08/11/2023 10:04 AM |
Project Title | South Spring Blvd. at MLK Dr. Intersection Improvements |
Physical Address | View project details and contacts |
City, State (County) | Tarpon Springs, FL 34689 (Pinellas County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,071,600 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of intersection upgrades at Martin Luther King Drive and South Spring Boulevard to mitigate sea level rise and frequent flooding by raising the intersection elevation, installing new storm drains and stormwater check valves. The project also includes geometric intersection improvements to improve traffic flow, driver visibility, and pedestrian safety. The pay quantity shall consist of all materials and labor necessary to complete the survey and layout by the Contractor in connection with the construction of the project, performed to the satisfaction of the Engineer. The pay quantity for the work specified under this Section shall be one Lump Sum quantity. All questions or requests for additional information are required to be in writing e-mailed to purchasing@ctsfl.us. Questions must be submitted, in writing, not later than May 10, 2023. The Contractor shall take care while removing the bricks, as the bricks will be used to rebuild the street. The Contractor shall submit his plan for brick removal to the City for approval at least 14 calendar days prior to initiation of the work. The Contractor's method of brick removal shall minimize damage to the existing brick to the extent possible. Use of a front-end loader, bobcat bucket, or similar equipment will not be allowed unless approved by the engineer. The City of Tarpon Springs will supply pallets where the bricks must be stacked neatly to a maximum of 10 courses. The Contractor shall wrap the pallets of brick in plastic to secure the bricks prior to removal from the site. The Contractor will transport the bricks to and from the City's storage facility. No pallets of bricks or loose bricks are to be left on the site at any time the site is unattended. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |