Similar Projects
The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

Ridgegate First Street Lift Station
Results
Lone Tree, CO

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

United Reservoir North Cell Pump Station
Post-Bid
Greenwood Village, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Chambers Reservoir Remediation Project Phase II
Post-Bid
Greenwood Village, CO 80111

Foundry Parking Garage Pump Station
Results
$100,000 to $150,000 est. value
Loveland, CO 80537

Repair Sewage Lift Station, Peterson AFB
Post-Bid
Colorado Springs, CO 80914

Pmaa, Pueblo Sfu - Replace Well Number 3
Results
Denver, CO 81105

Water System Improvements
Post-Bid
Romeo, CO 81148

CM/GC Services for Ralston Raw Water Pump Station and Pipeline
Results
Less than $75,000 est. value
Arvada, CO 80002

Reported 06/02/2021 12:00 AM
Project Title

VCC Lift Station Design-Build Rehabilitation

Physical Address View project details and contacts
City, State (County) Aurora, CO 80016   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The lift station needs rehabilitation and a reconfiguration for continued operation and to mitigate risk of future failures. Proposals for the selection of a Design-Builder for the Company to Design and Build the rehabilitation of the Valley Country Club (VCC) Lift Station. The proposals shall consist of qualifications, experience, financial proposal, and staffing plan.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents