Similar Projects
Law Enforcement Building Renovation
Renovation
Conception
$43,000,000 est. value
Corvallis, OR 97330

East Umatilla Fire and Rescue Fire Station Project
Renovation
Post-Bid
Umatilla, OR 97882

GAOA Burns Junction Fire Guard Station Renovation
New Construction, Demolition - 6,200 SF
Post-Bid
$5,000,000 est. value
Vale, OR

Seismic Retrofit Of The Existing Turner Fire Station
Alteration
Post-Bid
$894,600 est. value
Reedsport, OR

Myrtle Point Fire Station Addition and Seismic Upgrade
Addition
Results
Myrtle Point, OR 97458

New Public Safety Building
New Construction
Conception
$16,000,000 to $18,000,000 est. value
OR

Wood Street Fire Training Office Building Remodel
Renovation
Bidding
$100,001 to $1,000,000 est. value
Hillsboro, OR 97123

Seismic Retrofit of the Existing Police Station
Renovation
Post-Bid
$2,045,160 est. value
Reedsport, OR

Fire Station Remodels
Renovation
Conception
$28,500,000 est. value
Corvallis, OR 97330

Fire Station Remodel
Renovation - 5,110 SF
Post-Bid
$140,000 est. value
Gladstone, OR 97027

Provide Supply and Install Specialty Electronic Door Hardware at Law Enforcement Center and Service Center East
Renovation, Alteration
Results
$80,000 est. value
Hillsboro, OR 97123

Reported 06/01/2022 12:00 AM
Project Title

Lebanon Fire District Phase 1

Physical Address View project details and contacts
City, State (County) Lebanon, OR 97355   (Linn County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids. Owner to Subcontract.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of services for the limited hazardous materials survey included the following tasks: - Review and incorporate past asbestos survey information into this survey. - Collect bulk suspect asbestos-containing material (ACM) samples as necessary to identify ACM inthe Site buildings. Where bulk sampling or access is not possible, review available historical drawings and make inventory assumptions regarding the likely quantities of ACM that can be assumed. - Analyze for lead paint in Site buildings using a handheld X-ray fluorescence (XRF) analyzer. - Inventory universal wastes such as potential polychlorinated biphenyl (PCB)-containing lighting ballasts; high-pressure sodium lamps; mercury-containing fluorescent light tubes, switches, andthermostats; and various ozone-depleting substances. - Prepare a summary report documenting the findings of the survey and provide tables summarizing hazardous materials, analytical data, comments, and recommendations for handling and control. Building Description: The Site building was originally constructed in the 1970s. The Site has six buildings on the property that are included in the demolition plans.

Details

Fire/Police Station, 14,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents