Similar Projects
Replacement Of Three (3) Diving Boards At the City Of Irwindale Aquatics Center
Infrastructure
Design
$95,774 CJ est. value
Irwindale, CA 91706

RFP Design - Audio and Video Equipment Replacement
Renovation
Bidding
$709,252 CJ est. value
Cerritos, CA 90703

RFP General Contractors - Santa Rita Jail Network Infrastructure Camera Phase 2
Renovation
Sub-Bidding
$15,000,000 CJ est. value
Dublin, CA 94568

SB-9 Government Constraints Analysis
Term Contract
Sub-Bidding
Temple City, CA 91780

Joseph Jensen Water Treatment Plant Ozone Power Supply Units Replacement
Renovation, Alteration
Post-Bid
$1,000,000 to $1,400,000 est. value
Los Angeles, CA 91344

Dryer Asm
Alteration
Post-Bid
Los Angeles, CA

Dumbarton Express Corridor Improvement Project
Alteration
Results
Oakland, CA

NMUSD Transportation Building Bus Lift Replacement
Renovation
Results
$313,317 CJ est. value
Costa Mesa, CA 92626

Heat Pump Replacement
Renovation
Sub-Bidding
$388,000 CJ est. value
Bishop, CA 93514

Commercial Kitchen Equipment
Alteration
Post-Bid
Danville, CA

Estancia High School Softball and Baseball Scoreboards
Alteration
Results
$150,000 est. value
Costa Mesa, CA 92627

Freeways, and/or Arterial Roadway Right-of-way Outdoor Digital Media Signage Program
Infrastructure
Post-Bid
$200,000 CJ est. value
Riverside, CA 92522

Furnishing Butterfly Valves For The Wadsworth Bypass Pipeline, Inland Feeder-Rialto Pipeline Intertie, And Badlands Tunnel Isolation Surge Tanks
Alteration
Results
$5,000,000 to $7,000,000 est. value

Preventative Maintenance and Repair for Quincy Air Compressor DMV Sacramento
Term Contract
Post-Bid
$30,000 est. value
Sacramento, CA 95818

Fitness Center Equipment and Flooring
Alteration
Results
$70,000 est. value
Orange, CA 92868

Last Updated 09/16/2023 08:03 AM
Project Title

Bicycle Lockers Replacement

Physical Address View project details and contacts
City, State (County) San Jose, CA 95112   (Santa Clara County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This scope does not include the electronic lockers at the Milpitas and Berryessa BART Stations. Those electronic lockers were recently purchased and do not need to be replaced. Question Deadline 08/29/2023 at 4:00 PM PT The Services will be completed in a minimum of two phases over two years (2023 -2024). Operations and maintenance must begin with the first phase of lockers and continue through the full five-year contract (see Section J) . All lockers must be delivered by May 2024. (Phase 1) 100 lockers will be delivered and installed by November 1, 2023. (Phase 2) Approximately 100 lockers will be delivered and installed by March 1, 2024, or sooner. We expect a cost proposal to be within a range of $1,400,000 - $1,700,000 for services and items proposed in the scope of work Disadvantaged Business Enterprise (DBE) Goal: 6% DBE Goal The questions and answers will not be included in the minutes. If you need a formal response to your inquiry, please email your questions to: cathy.clegg@vta.org *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $1,400,000 - $1,700,000.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents