Project Title | 2022 Levee Maintenance Project |
Physical Address | View project details and contacts |
City, State (County) | Kelso, WA (Cowlitz County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work performed under this contract will consist of the following: Providing all materials and labor to remove existing 16-inch pipe, pilings, and a level gauge from the Coweeman levee, install 16-inch Tideflex check valve, and construct rip rap bank at the Elks Pump Station site; construct temporary cofferdams, dewater the working area, and clean out and abandon-in-place existing 48-inch pipe with grout, demolish and abandon-in-place existing concrete vault, including slide gate, and blast and recoat existing above-grade 30-inch discharge pipe at the Baker Way Pump Station site; and remove and waste haul existing 18-inch pipe at the Dike Road Outfall; site restoration, and all other work. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |