Similar Projects
Briarfield Park - City of Hampton
New Construction, Alteration
Conception
$1,200,000 est. value
Hampton, VA 23661

Construct a 65 Linear Foot Aerial (Six Circuit) 138kv Power Line Crossing of Dismal Creek in the Vicinity of Lower Fork Road and Dismal River Road
Infrastructure
Design
Hampton, VA 23669

Olde Hampton Village Development / Former Lincoln Park
Demolition, New Construction, Infrastructure - 6,000 SF
Design
$100,000 CJ est. value
Hampton, VA 23669

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Flight Dynamics Research Facility, NASA Langley Research Center, Hampton, VA
Results
$37,000,000 to $42,000,000 est. value
Hampton, VA 23681

Air Force Targeting Center
New Construction - 94,800 SF
Results
$25,000,000 to $100,000,000 est. value
Hampton, VA

Kings Arm Apartments
New Construction, Infrastructure
Pending Verification
$9,400,000 CJ est. value
Hampton, VA 23669

Traditional Residential House Flooring
Term Contract, Renovation, Infrastructure
Design
$100,000 CJ est. value
Hampton, VA 23669

Modernize Interior Finishes
Renovation
Bidding
$10,000,000 CJ est. value
Hampton, VA 23667

RFQ Design - VA Construct ICU and Pathology On New Floor Building 110B
Renovation
Post-Bid
$20,000,000 CJ est. value
Hampton, VA 23667

Structural Repair/Upgrade Building 27
Renovation
Results
$2,000,000 to $5,000,000 est. value
Hampton, VA 23667

Atlantic Ocean Channel Deepening Phase 2
Infrastructure
Bidding
$100,000,000 CJ est. value
Hampton, VA 23669

Last Updated 03/07/2023 08:03 AM
Project Title

Construct Additional Parking Hampton Va Medical Center

Physical Address View project details and contacts
City, State (County) Hampton, VA 23667   (Hampton City County)
Category(s) Government/Public, Heavy and Highway, Medical
Sub-Category(s) Hospital, Military Facility, Parking Garage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,355,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Dec 20, 2022 Contract Award Number: 36C24623C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: N2H6YLMHS5J9 Contractor Awarded Name: TST TACTICAL DEFENSE SOLUTIONS, INC. Contractor Awarded Address: VIRGINIA BEACH, VA 23453 Base and All Options Value (Total Contract Value): $1,355,000.00 INVITATION FOR BID: Project No.: 590-20-103 - "Construct Additional Parking Lot" ** This is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) ** Contract Type: Firm-Fixed Price Magnitude of construction for this project between $500,000 and $1,000,000 IAW FAR 36.204(e). North American Industry Classification System (NAICS) Code:236220, Commercial and Institutional Building Construction. Size standard of $39.5 Million and Geographical Location of work to be performed: Hampton, VA Site Visit: August 19, 2022 at 10:00AM. Questions/requests for information due 12:00PM EST on August 26, 2022; Email: guy.brooks@va.gov and tonya.bradley@va.gov Bids Due: September 16, 2021 9:00 AM EST. Bids must be emailed only to: tonya.bradley@va.gov and guy.brooks@va.gov. Virtual Bid Opening: September 21, 2021 9:00 AM EST, Microsoft Teams invite will be sent to all responsive bidders.BID ITEM I (BASE BID): This is a new requirement and being procured in accordance with Federal Acquisition Regulation (FAR) 36 and VA Acquisition Regulation (VAAR) 836 and VA Acquisition Manual (VAAM) 836 for the project to include construction of an eighty-nine (89) space employee asphalt parking lot. The contractor shall be responsible for performing all required work associated with the construction of an additional parking lot defined in the specifications and drawings. The contractor shall provide all labor, tools, material, equipment and supervision to complete all work for the entire project as indicated in the contract documents, including professional services, and expertise required to perform general construction, alterations, demolition, site work, grubbing and soil removal, adjustments/relocation to existing utilities, grading, site alterations and works, electrical work, concrete work, planting, pavement marking, general construction of roads, walks, curbs and gutter, installation of storm water structures and pipe, drainage, permeable pavers and storm water management systems, necessary removal and demolition of existing, relocation and storage, pavement marking, installation of signage, painting, hauling, disposal and all other items shown on the contract documents. (Completion time: 220 calendar days) Construct Additional Parking Project 590-20-103 Hampton VA Medical Center, Hampton, VA 23667 Scope: The Contractor shall be responsible for performing all required work associated with the construction of additional parking as defined in the Specifications and Drawings. The contractor shall provide all tools, labor, materials, equipment, supervision, professional services, and expertise required to perform general construction, alterations, site work, grubbing, grading, select demolition, hauling, disposal, installation of stormwater drainage structures and pipes, electrical work, relocation of existing utilities, permeable paver work, concrete work, curb and gutter work, planting, pavement marking, and installation of signage. The contractor shall manage and perform construction period services as further defined in the Contract to include, but not limited to, permitting, demolition, construction, construction management, submittals, equipment, scheduling, inspection and testing, environmental protection, recording of (As-Built) drawings and project closeout. The contractor shall also develop a schedule demonstrating fulfillment of the contract requirements such as: Project Schedule, Contractor Quality Control, Work Breakdown Structure (WBS) Plan, Environmental Plan and all other plans listed within this document to include deliverables. The Contractor shall keep the Project Schedule up to date in accordance with the requirements of the contract and shall utilize the plan for scheduling, coordinating, and monitoring work under this contract (including all activities of subcontractors, equipment vendors and suppliers). (a) General: The following is a brief summary of the work: STATEMENT OF BID ITEM(S) 1. BID ITEM I (BASE BID): Work includes all labor, material, equipment and supervision to complete all work for the entire project as indicated in the contract documents, including demolition, grubbing and soil removal, adjustments to existing utilities, grading, site alterations, and general construction of roads, walks, curbs and gutter, stormwater structures and pipe, drainage, permeable pavers and stormwater management systems, necessary removal and demolition of existing, relocation and storage, pavement marking, signage, painting, and all 36C24622B0042 Page 9 of 87 other items shown on the contract documents. (Completion time: 220 calendar days) 2. BID ITEM II (DEDUCT ALTERNATE NO. I): Contractor shall perform all work as described in the base bid except deduct construction of 25 permeable parking stalls along Harris Avenue. Deduct to include grading, demolition and construction of new curb and gutter, asphalt, and bollards at the parking stalls. All other work in the bid deduct area necessary to complete the remainder of the project base bid as designed, including utilities and stormwater connections shall still be performed by the contractor. (Completion time: 190 calendar days) (b) Place of Performance: Tasks will be performed at the VA Medical Center, Hampton, VA, 23667. Work will be around an occupied healthcare facility in operation 24 hours a day. PRE-BID CONFERENCE: A pre-bid conference has been scheduled Friday, August 19, 2022, at 10:00 a.m., in the Contracting Parking Lot, 100 Emancipation Drive, Building 27, outside of Contracting Office, Hampton VA Medical Center. This pre-bid conference will be the only opportunity for potential bidders to visit the site. No more than two (2) representatives from each company and Contractor must submit their name(s) no later than Wednesday, August 17, 2022 @ 3:00 PM EST to Guy.Brooks@va.gov and tonya.bradley@va.gov. All potential bidders, subcontractors, and suppliers are required to attend this pre-bid conference to submit a bid. NOTE: QUESTIONS REGARDING THIS SOLICITATION MUST BE SUBMITTED VIA E-MAIL TO guy.brooks@va.gov and tonya.bradley@va.gov; NO TELEPHONE QUESTIONS WILL BE ACCEPTED. CUT OFF FOR QUESTIONS IS 12:00 PM (LOCAL TIME), FRIDAY AUGUST 26, 2022. NO FURTHER QUESTIONS WILL BE ADDRESSED AFTER THAT DATE/TIME. KEYS: All keys provided the Contractor for use during the project shall be returned to the Contracting Officer's Representative (COR) at completion of the work or upon request. No keys shall be reproduced by the Contractor. There shall be a charge of $10.00 for each key that is lost or not returned to the COR. Payment shall be made to the VA Medical Center, Hampton, VA upon receipt of a Bill of Collection. PREPARATION OF BIDS/OFFERS/BIDS: Neither the VAMC nor the VISN 6 CAS will pay for any costs incurred in preparation and submission of bids or bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Casework, Furniture, Office Furniture, Seating, Institutional Furniture, Healthcare Furniture, Multiple Seating.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents