Similar Projects
Intercollegiate Athletics Golf Facility - Golf Course Package
New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Tuscaloosa, AL 35401

GSA/OGB Core Repository Warehouse Building
New Construction, Infrastructure
Bidding
$329,000 CJ est. value
Tuscaloosa, AL 35401

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Oliver-Barnard and Tuomey Halls Renovations and Addition - University of Alabama
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Tuscaloosa, AL 35401

Brookwood Parkway Water Main
Infrastructure
Results
Vance, AL 35490

Maintenance Grounds Office Demolition
Demolition
Results
$172,200 est. value
Tuscaloosa, AL

Crisstown Road Water Main Replacement
Infrastructure
Construction
$200,000 est. value
Tuscaloosa, AL

Water Main Relocation
Infrastructure
Construction
Northport, AL

Element Hotel / Tuscaloosa
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Tuscaloosa, AL 35401

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

Performing Arts Academic Center
New Construction, Infrastructure
Bidding
$110,000,000 CJ est. value
Tuscaloosa, AL 35401

Citizens Water Service - Water Main Extension
Infrastructure
Post-Bid
Vance, AL

AMI Meter Cables
Alteration
Results
$26,600 est. value
Tuscaloosa, AL

Fit Foodz / Tuscaloosa
Addition, Renovation, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Tuscaloosa, AL 35401

Tuomey Hall Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Bidding
$6,500,000 CJ est. value
Tuscaloosa, AL 35401

Last Updated 01/24/2023 11:34 AM
Project Title

2021 American Rescue Plan Act, Meter Replacement Project- Contract A, B, C

Physical Address View project details and contacts
City, State (County) Buhl, AL 35446   (Tuscaloosa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $421,268 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 17, 2023, construction is underway and expected to be completed in 3 months. Contract A was awarded to Consolidated Pipe & Supply for $276,421.00. Contract B was awarded to Consolidated Pipe & Supply for $45,537.50. Contract C was awarded to Centerline Contracting, Inc. for $99,309.41. Total = $421,267.91 ESTIMATE: Contract A :$275,000 Contract B: $64,000 Contract C: $89,000 The Owner reserves the right to waive any informality or to reject any or all bids, and to award the contract to the lowest and most responsible bidder. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders.All Contractors preparing Bids for the referenced project shall submit a list of similar projects (successfully completed) in the last two years, having the same scope of work with construction cost similar to or greater than this project. All nonresident contractors preparing bids shall submit with the bid documents evidence of a current Alabama General Contractor's License, evidence (with original seal of the State of Alabama) of proper registration with the Alabama Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Alabama Department of Revenue. Bids submitted by a nonresident contractor without these documents included will be rejected. No bidder may withdraw his bid within sixty (60) days after the opening thereof. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents