Similar Projects
Harrison High School Soccer Parking Lot Sidewalk
Post-Bid
West Lafayette, IN 47906

2021 Amberleigh Village Concrete
Infrastructure, Alteration
Post-Bid
West Lafayette, IN 47906

2021 CDBG Curb, Sidewalk, Drive Approach and Ramp Replacement
Results
Lafayette, IN 47904

ADA Sidewalk Ramp Construction
Results
IN

2021 Amberleigh Village CDBG
Infrastructure
Post-Bid
West Lafayette, IN

Treece Meadows North Entrance Reconstruction
Results
Lafayette, IN 47905

Lafayette Main Street Streetscape - Phase 4
Infrastructure
Post-Bid
Lafayette, IN

Highland Park Curb Replacement
Results
Lafayette, IN 47905

2022 CCMG Tomahawk Lane
Infrastructure
Post-Bid
Battle Ground, IN 47920

South 9th Street Sidewalk Reconstruction
Infrastructure
Results
Lafayette, IN 47901

Lafayette Parks and Recreation Columbian Park Restrooms Phase 2 - Sidewalks
Infrastructure
Post-Bid
$400,000 est. value
Lafayette, IN 47904

2021 CDBG Road Improvements
Infrastructure
Results
West Lafayette, IN 47906

2021 Dover Estates-Handicap Ramps and Street Repair
Infrastructure
Results
Lafayette, IN

Krach Leadership Center Lawn Pedestrian Pathway Installation
Infrastructure
Results
Less than $2,000,000 est. value
West Lafayette, IN 47906

Ramp Replacement Project
Infrastructure
Results
Lafayette, IN 47909

Last Updated 05/30/2022 09:01 AM
Project Title

2022-2 Ramp Replacement Project

Physical Address View project details and contacts
City, State (County) Lafayette, IN   (Tippecanoe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general description of work for which proposals are to be received consists of: Remove and replace ramps, curb and gutter and associated sidewalk along Owen Street from S. 3rd Street to Holloway Drive, Holloway Drive from Washington Street to Sunset Drive, Sunset Drive Loop and the intersection of Central Street and S. 3rd Street and any other miscellaneous work pertaining to the project work area. (See Technical Specifications).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents