Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Water Activated Cold Patch
Term Contract
Results
VA

Smart Scale Roundabout Construction
Results
Less than $1,979,000 est. value
VA

Paving Services
Results

2020 Latex Modified
Results
Less than $1,080,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

2020 Plant Mix
Results
Less than $3,542,000 est. value

Smart Scale - Extend NB Accel Lane at Belvidere St
Results
Less than $2,451,000 est. value
VA

Water Activated Cold Patch
Term Contract
Results

Smart Scale - Interchange Improvement
Results
Less than $5,584,000 est. value
VA

2021 Cape Seal / Slurry Seal
Results
Less than $3,104,000 est. value

2021 Surface Treatment
Results
Less than $3,091,000 est. value

Smart Scale - Construction of Emergency Pull-Offs
Results
Less than $1,189,000 est. value
VA

2021 Plant Mix
Results
Less than $2,307,000 est. value

2021 Plant Mix
Results
Less than $4,793,000 est. value

Reported 03/07/2020 12:00 AM
Project Title

I-64 Express Lanes Expansion

Physical Address View project details and contacts
City, State (County) VA   (Richmond County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Hampton Roads Regional Express Lanes effort, and for this Project, VDOT will be bringing on 14 additional miles of Express Lanes that will begin at Bower’s Hill and end at I-264. A fully developed Express Lanes network is envisioned in the region and will provide over 45 miles of Express Lanes with the goal of addressing the region’s significant congestion needs. As shown in Figure 1, the I-64 Express Lanes in Segment 2 will have three toll zones in both Eastbound (EB) and Westbound (WB) directions (2A, 2B, 2C). The Express Lanes in zones 2A and 2B will be created by converting the existing 7.5 miles of HOV lane in each direction between I-264 and I-464 to a HOT lane. Zone 2C will be created by adding a single HOT lane in each direction for 8 miles from I-464 to the I-264/I664/Bowers Hill interchange as part of the High Rise Bridge (HRB) project whose limits are from approximately 0.5 mile east of the I-264/I-664 Bowers Hill Interchange to one mile east of I-464.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents