Similar Projects
Grande Esplanade
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
North Ridgeville, OH 44039

Roadway Minor Rehab
Infrastructure
Design
$1,487,000 CJ est. value
Elyria, OH 44035

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Design - New Fire Station Facility
New Construction, Infrastructure - 12,000 SF
Post-Bid
$3,000,000 CJ est. value
Grafton, OH 44044

Resurfacing of Burns Road
Infrastructure
Results
Elyria, OH 44036

Toll Plaza 152 Expansion
Addition, Infrastructure
Results
$1,700,000 est. value
OH

Abbe Road North Refrigerated Warehouse
New Construction, Infrastructure - 150,000 SF
Pending Verification
$24,340,000 CJ est. value
Sheffield Lake, OH 44054

Abbe Road North Refrigerated Warehouse
New Construction, Infrastructure - 150,000 SF
Pending Verification
$24,340,000 CJ est. value
Sheffield Lake, OH 44054

The LORCO - Cinnamon Lake Maintenance Building project
Demolition, New Construction, Infrastructure
Design
$3,327,000 CJ est. value
Wellington, OH 44090

Resurfacing of LOR-CR17-6.98 (Lake Breeze Road) LOR-CR641-0.45 (Harris Road)
Infrastructure
Post-Bid
$605,602 est. value
Sheffield Lake, OH 44054

Envision Main Street Phase 1
Infrastructure
Results
$1,357,000 est. value
Grafton, OH 44044

Noveon/Lubrizol Building Addition
Addition, Demolition, Infrastructure - 1,856 SF
Pending Verification
$1,000,000 CJ est. value
Avon Lake, OH 44012

New 6-12 Grade Building - Oberlin City School District
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Oberlin, OH 44074

Stove Works Brownfield Revitalization and Brownfield Program
Infrastructure
Post-Bid
Lorain, OH

2022 Asphalt Street Program
Infrastructure
Results
Avon Lake, OH

Last Updated 07/20/2023 06:08 AM
Project Title

2023 Elementary Circle Paving Project

Physical Address View project details and contacts
City, State (County) Grafton, OH 44044   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $137,485 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

To begin no earlier than June 5, 2023, and must be completed by July 17, 2023. - Approximately 51,000 square feet, - To be milled at a 4" depth and grindings hauled away, - Level, grade, and compact existing base, - Pave with 4" of hot mix asphalt: 2 1/2" of #301 base asphalt and 1 1/2 " of #448 Type 1 surface course asphalt, - Roll and compact asphalt after each course of installation, - After completion, stripe all parking stalls. - Roughly 60 parking stalls on the outer circle, 53 stalls on the inner circle, 6 Handicap stalls and 3 crosswalks, directional arrows at North and South entrances.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents