Similar Projects
Sand Spring Run Stream Bank Restoration
Design
Stroudsburg, PA

Dunbar Creek Flood Protection Project
Post-Bid
$500,000 to $1,000,000 est. value
Dunbar, PA 15431

South 6th Street Floodplain Restoration Project
Post-Bid
Lewisburg, PA 17837

Doyle Avenue Landslide Repair
Results
PA

Butternut Lane Culvert Project
Results
Millville, PA 17846

FY 2019 CDBG Storm Drainage Improvements along Kelly Avenue
Post-Bid
Folsom, PA 19033

SR 866 Culvert Rehabilitation Project
Results
Williamsburg, PA

Furnish and Install a Precast Reinforced Concrete Box Culvert and Associated Items on Elm Street in Arnot
Post-Bid
Arnot, PA 16911

Gettysburg Road Drainage and Widening Project Phase II
Results
Littlestown, PA

Laurel Lake Road
Post-Bid
Columbia Cross Roads, PA 16914

Reconstruction of Mckinley Street Wall
Results
Export, PA

Besley Road
Post-Bid
Columbia Cross Roads, PA 16914

Scott Township CD 44 7.5 Georges Run Stream Restoration
Results
Pittsburgh, PA

1,526 LF 6 Inch Pipe Underdrain, Installed
Post-Bid
Indiana, PA 15701

Inlet Road Culvert Replacement
Results
Linesville, PA 16422

Reported 06/02/2021 12:00 AM
Project Title

Downspout Drainage Lines

Physical Address View project details and contacts
City, State (County) Farrell, PA 16121   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

General Scope Overview: This work consists of tying in existing down spouts to a new inground drainage line and directe to a drainage field. Sidewalks will need cut and concrete replaced to install drainage piping. Drainage Work Scope: 1. Connect 7 down spouts to drainage lines as indicated on print. 2. Drainage pipe shall connect to each down spout with boot up 6 inches minimum with proper connections. 3. Drain line piping to be Schedule 40 PVC sloped for drainage and deep enough for topsoi to grow over. 4. Concrete sidewalk cuts to be neat and refilled flush to existing sidewalks with expansions and tie into adjacent slabs. (See attached Sketch) gravel base to be tamped to preven settling. 5. Drains on the North side (5) shall run West to slope and dispersed from drain into a 5'x5 'x6" deep gravel drainage field. Drainage end to have grate to prevent animals from entering. Grate must be removable for cleaning. 6. Each run shall have a clean out flush with the ground. Not to interfere with mowing. 7. The two South down spouts are to be directed to the parking lot pavement as indicated on print. Other travel routes would be considered as well. 8. All grass ditch areas to be reseeded and straw applied. Sod removed from the ditch may be reinstalled over drainage lines and tamped. Light seeding and straw shall still be applied. 9. Drain lines may be set in even dirt. No gravel base is required. 10. All work and materials to be warranted for one

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents