Similar Projects
Last Updated | 02/12/2020 04:31 AM |
Project Title | Preservation - District 6 |
Physical Address | View project details and contacts |
City, State (County) | (Berkeley, Charleston Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Borrow Excavation 350.000 Cy Maintenance Stone 22.140 Ton Liquid Asphalt Binder Pg64-22 288.569 Ton Liquid Asphalt Binder Pg76-22 251.352 Ton Full Depth Asph. Pav. Patching 6" Unif. 2,214.000 Sy Milling Existing Asphalt Pavement 1.75" 54,446.900 Sy Milling Existing Asphalt Pavement (Variable) 650.000 Sy Milled-In Rumble Strip 9.860 Mi Hot Mix Asphalt Surface Course Type b 5,444.690 Ton Hot Mix Asphalt Surface Course Type e 3,866.940 Ton Permanent Construction Signs (Ground Mounted) 2,468.000 Sf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 12,728.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 54,584.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 82.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 6.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 6.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 3,340.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 38,864.000 Lf 8" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 136.000 Lf 24" Yellow Solid Lines - Perm.Pvmt.Marking 180.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 12,966.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 105,100.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 128.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 12.000 Ea White Word Message "Only"-Fast Dry Paint 12.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 6,680.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 74,560.000 Lf 24" Yellow Diagonal Lines - Fast Dry Paint 360.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 533.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 500.000 Ea Removal Of All Pavement Markings 9.860 Lm Furnish & Install 1.0" Schedule 80 Pvc Conduit 200.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 3,000.000 Lf Furnish & Install Epoxy Tubes 4.000 Ea Furnish Epoxy Applicator 4.000 Ea Sawcut For Loop Detector 1,400.000 Lf Install Flush Mounted Wireless Sensor 28.000 Ea Remove Flush Mounted Wireless Sensor 28.000 Ea Root Barrier 70.000 Lf |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |