Similar Projects
New Shoulders on IL 163
Infrastructure
Bidding
$2,000,000 CJ est. value
Millstadt, IL 62260

Runway 14L/32R Rubber Removal and Marking
Infrastructure
Bidding
$113,000 CJ est. value
Mascoutah, IL 62258

Maintain and Service All ITS Equipment at Various Locations and Replacement of the Dynamic Message Board on Westbound I-70
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Holiday Shores, IL 62025

LTCP Phase V - CSO UV Disinfection
New Construction
Post-Bid
Belleville, IL 62220

North Jefferson Street (Il 4) Shared Use Path
Infrastructure
Post-Bid
$324,013 est. value
Mascoutah, IL 62258

Building Demolition and Site Work - AMP 3
Demolition
Results
Centreville, IL

Site Preparation and Oil and Chip Treatment at Peabody River King State Fish and Wildlife Area
Infrastructure
Results
IL

Public Safety Building at Emerson Park Metro Station
New Construction, Infrastructure - 16,113 SF
Bidding
$15,000,000 CJ est. value
East Saint Louis, IL 62201

L and N Railway Trail and Trailhead
Infrastructure
Post-Bid
$981,000 est. value
Mascoutah, IL

Wastewater Treatment Facility Improvements Phase II
Renovation, Infrastructure
Results
Belleville, IL

Schranz Park Shared-Use Path and Sidewalk Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Swansea, IL 62226

Zone 6 - Statewide Leaking Well Plugging and Restoration Work
Infrastructure
Post-Bid
$90,000 CJ est. value
Germantown, IL 62245

Waste Water Treatment Plant WWTP UV Disinfection Upgrade
Renovation
Results
$874,400 CJ est. value
Swansea, IL 62226

2022 Street Rehabilitation Woestboul Street
Infrastructure
Post-Bid
$1,100,000 CJ est. value
East Saint Louis, IL 62203

3 Paving Projects
Infrastructure
Post-Bid
$480,000 CJ est. value
Millstadt, IL 62260

Last Updated 08/04/2022 03:05 AM
Project Title

Coldwater Creek WWTF Repairs and Improvements (2023)

Physical Address View project details and contacts
City, State (County) East Saint Louis, IL 62201   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $8,200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrades of wastewater treatment facilities including sitework, yard piping, structural, architectural, process piping and equipment, heating, ventilation, electrical, and instrumentation and control. Major items included in the Project include the following: 1. Modification of the existing coarse screen gripper track to accommodate the addition of a curved switch track, the addition of a curved switch track and new monorail section, and replacement of the coarse screen gripper units. 2. Replacement of air distribution piping and step feed butterfly gates within the Aeration Basins. 3. Replacement of piping, fittings, meters, and valves within and immediately surrounding the Aeration Control Building associated with the air distribution, return/waste sludge system, and primary effluent system. 4. Removal of unused return sludge piping and water piping with asbestos-containing insulation within the Aeration Control Building. 5. Improvements to provide better access to the lower level of the Aeration Control Building. 6. Heating and ventilation equipment upgrades for Aeration Control Building.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents