Similar Projects
Multifamily Project
New Construction - 28,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27127

Ardmore Commons
New Construction
Construction
Winston-Salem, NC 27103

Glennview
New Construction
Design
Kernersville, NC 27284

Old Mill Subdivision
New Construction
Design
Clemmons, NC 27012

Weatherwood Mews
New Construction
Design
Winston-Salem, NC 27103

Hanes View
New Construction
Design
Winston-Salem, NC 27100

Metropolitan Village
New Construction - 39,810 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27101

Living Word Fellowship Townhomes
New Construction
Conception
Winston-Salem, NC 27106

450 Polo Road
New Construction
Conception
Winston-Salem, NC 27105

Wooten Farms
New Construction
Design
Winston-Salem, NC 27114

Murray Heights
New Construction - 3,213,210 SF
Design
Winston-Salem, NC 27106

Villas at Grandview
New Construction - 855,965 SF
Design
$10,000,000 CJ est. value
Pfafftown, NC 27040

Winston-Salem Choice Neighborhood Initiative
New Construction
Post-Bid
Winston Salem, NC

Harvest Creek
New Construction
Design
Winston-Salem, NC 27107

Winston-Salem CNI Phase 1
New Construction - 77,917 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Winston-Salem, NC 27101

Reported 02/22/2022 09:59 AM
Project Title

Redwood Apartments Winston Salem

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC 27114   (Forsyth County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Owner to Subcontract.
Project Status Obtained from a credible source, Awaiting verification
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

16 Multi-Family Homes, New Construction, 115 Unit(s), 24.60 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents