Similar Projects
Gym Air Conditioning at Middle/High School
Renovation
Design
$205,666 CJ est. value
Crivitz, WI 54114

Replacing Existing Air Handlers - Fort McCoy, WI
Renovation
Design
$1,000,000 CJ est. value
Fort McCoy, WI 54656

Boiler Controls Update at the Public Safety Building
Renovation
Bidding
$400,000 CJ est. value
Kenosha, WI 53140

Chancellors Hall HVAC System Renovation - GPC
Renovation
Sub-Bidding
$895,000 CJ est. value
Eau Claire, WI 54701

South Housing Ventilation Upgrades
Renovation
Sub-Bidding
$145,500 CJ est. value
Prairie du Chien, WI 53821

Barker's Island Marina Office HVAC Upgrade and Lighting Replacement
Alteration
Post-Bid
$200,000 est. value
Superior, WI 54880

2022 Medical Examiner Facility CT Scanner Room - HVAC and Electrical Proposals
Renovation
Post-Bid
$200,000 CJ est. value
New Richmond, WI 54017

Dewey Water Distribution Building HVAC Upgrade
Renovation
Results
$147,207 CJ est. value
Manitowoc, WI 54220

Repair HVAC B103
Infrastructure
Results
$100,000 to $250,000 est. value
Fort McCoy, WI 54656

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Replace Boiler Building 121 and 122
Renovation
Construction
$159,230 CJ est. value
Camp Douglas, WI 54618

Chancellors Hall HVAC System Renovation - MEP
Renovation
Sub-Bidding
$150,000 CJ est. value
Eau Claire, WI 54701

HVAC and HE+ Furnace Program - Materials and Labor (Weatherization)
Alteration
Post-Bid
Milwaukee, WI

Bldg 200 Repair by Replacement Boiler and Controls and Repair Air Compressor Exhaust
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

Levis Water Heater Replacement
Renovation
Construction
$79,550 CJ est. value
Black River Falls, WI 54615

Last Updated 09/20/2023 03:05 AM
Project Title

Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54304   (Brown County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $192,100 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the above project. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. The bidder is responsible for the sealed bid being delivered to the indicated location or email before the time specified for the bid submission. Third party delivery is entirely at the bidder's risk. Bidders may also join the Microsoft Teams meeting via Microsoft Teams: Click here to join the meeting In general, the work consists of: Replacing the cooling tower and condenser pump with equipment of equal capacity. The condenser supply and return piping between the tower and interior isolation valves will be replaced. Piping and structural steel modifications will be made as necessary to accommodate the new tower configuration. The variable frequency drive serving the tower fan motor will be replaced. Construction bidding documents (drawings, specifications and addenda) may be obtained only as downloadable electronic files (in PDF format) from the Division of Facilities Development website. After opening the web page, select Current Construction Project Bidding Opportunities at the bottom of the screen. Bidder shall identify the division of work they are bidding on when requesting Bidding Documents online. No deposit is required to obtain documents for 48 bidding purposes. Contract offer and construction phase records will be processed electronically on the WisBuild(TM) DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Please contact Matt Veriha, Phone: 920-432-4865, email: mveriha@bsagb.com for additional information. 10 Bidding Documents will be available online immediately upon the project being advertised for bid.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents