Similar Projects
Rodney Reconstruction Phase 2 - City of Helena
Infrastructure
Conception
$1,126,284 CJ est. value
Helena, MT 59601

Rodney Reconstruction Phase 2 - City of Helena
Infrastructure
Conception
$1,126,284 CJ est. value
Helena, MT 59601

Westside Woods
New Construction, Infrastructure
Design
$65,000,000 CJ est. value
Helena, MT 59601

Blixit Once Pre commercial Tree Thinning
Infrastructure
Bidding
$210,000 CJ est. value
Helena, MT 59601

Nwlo Gates
Infrastructure
Bidding
$171,000 CJ est. value
Helena, MT 59601

Lincoln Road Overlay and Chip Seal
Infrastructure
Post-Bid
$400,000 CJ est. value
Helena, MT 59601

Lincoln Road Overlay and Chip Seal
Infrastructure
Post-Bid
$400,000 CJ est. value
Helena, MT 59601

2022 Crack Seal Project
Infrastructure
Results
Helena, MT

Jackson Creek Road Improvements
Term Contract
Results

2022 Chip Seal
Infrastructure
Construction
$582,933 CJ est. value
Helena, MT 59601

2022 Chip Seal
Infrastructure
Construction
$582,933 CJ est. value
Helena, MT 59601

The Capital
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Helena, MT 59602

Sanders Street Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Helena, MT 59601

8th / 9th & Dakota Rehabilitation - City of Helena
Infrastructure
Conception
$600,000 CJ est. value
Helena, MT 59601

Gateway PCT & Slashing
Infrastructure
Bidding
$343,000 CJ est. value
Helena, MT 59601

Last Updated 08/13/2023 11:01 AM
Project Title

US 12 Capital Interchange Overlay

Physical Address View project details and contacts
City, State (County) Helena, MT 59601   (Lewis and Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Capital Interchange Bridges Deck Repair The Capital Interchange bridges on US 12 eastbound and westbound, over Interstate 15 (MDT ID 05322 and 05323) has an asphalt overlay in need of replacement. This project includes cold milling, deck preparation, plant mix surfacing overlay, and new asphaltic plug joints on the structure per the specifications herein and Special Provisions (attached).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents