Similar Projects
Jonah Sewer Water and Sewer Improvement Project
Infrastructure
Design
$500,000 CJ est. value
Tazewell, VA 24651

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

4.0 MGD WWTP Upgrades and Improvements
Renovation
Results
Richlands, VA 24641

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Acorn Road Drainage Project, Wise Virginia
Infrastructure
Construction
$21,890 CJ est. value
Appalachia, VA 24216

Tazewell Little League Fields Project
Infrastructure
Post-Bid
$550,000 CJ est. value
Tazewell, VA 24651

Sewer Line Extension Project
Renovation, Infrastructure
Results
$60,000 CJ est. value
Pocahontas, VA 24635

Blue Heron Landing Park
Infrastructure
Post-Bid
$775,000 CJ est. value
Chesapeake, VA 23464

Water System Capital Improvements Phase II
Infrastructure
Results
$2,954,000 CJ est. value
Bluefield, VA 24605

Multi-use Community Athletic Facility
New Construction, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Bluefield, VA 24605

2020 Little League Baseball Lighting Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Bluefield, VA 24605

Monitoring Well Drilling Services
Infrastructure
Post-Bid
$40,000 CJ est. value
Tazewell, VA 24651

Repair Existing Trails and Build New Trails at Cavitts Creek Park
Infrastructure
Post-Bid
$511,000 CJ est. value
N Tazewell, VA 24630

Tennis Court Resurfacing
Infrastructure - 18,500 SF
Post-Bid
$90,000 CJ est. value
Richlands, VA 24641

Last Updated 07/18/2023 09:51 AM
Project Title

Tazewell Regional Wastewater Treatment Plant Improvements Project

Physical Address View project details and contacts
City, State (County) Tazewell, VA 24651   (Tazewell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $15,645,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Only contractors that have been pre-qualified in accordance with the procedures in the Pre-qualification Application will be eligible to submit bids for this project. Bids received from those who have not been pre-qualified will not be considered. Construction bids for this project are scheduled to be received in August 2021. The Tazewell Regional Wastewater Treatment Plant Improvement project involves the following elements: Construction of a new wetwell/drywell influent pump station with a mechanical screen system; Replacement of primary sludge, secondary recycle sludge, waste sludge, digested sludge, nonpotable and various other pumps; Construction of a new induced vortex grit removal system at the existing grit building; Replacement of clarifier mechanisms at two primary clarifiers and two secondary clarifiers; Replacement of air diffuser, mixing systems and associated blowers for a dual train MLE activated sludge secondary treatment system; Installation of an MLE MLSS recycle pump system; Replacement of the existing channel UV system; Rehabilitation of an existing dual traveling bridge tertiary filtration system; Replacement of air diffuser systems and associated blowers for two aerobic digesters; A building addition to the existing pre-engineered metal building housing the sludge dewatering system; Installation of a new belt press to replace an existing belt press; Installation of a new belt conveyor for dewatered cake; Demolition of existing glass greenhouse building at dewatered cake storage area; Construction of new open-walled structure over dewatered cake storage area; Replacement of the existing stand-by generator and automatic transfer switch; Replacement of miscellaneous process piping, valves, gates, and meters; Installation of new process instrumentation including DO, pH and ORP meters; Roof replacement at two buildings; Ventilation and heat replacement/improvements at three buildings; Replacement of existing controls and SCADA throughout the plant; Electrical upgrades; Miscellaneous demolition throughout the plant to allow for installation of new equipment. The General Contract for this project is anticipated to be advertised for bid on July 18, 2021. The projected contract award is planned for November 2021, with an anticipated construction start in November/December 2021. The overall construction duration is planned to be 12 months. These are estimated dates and durations and are subject to change. The cost of this project is estimated to be $7.5-9.5 million. The Town of Tazewell reserves the right to reject any and all Applications, and to waive informalities and irregularities in the Pre-qualification Application procedure.

Details

Lift and Pump Stations, Renovation, Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents