Project Title | Tazewell Regional Wastewater Treatment Plant Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Tazewell, VA 24651 (Tazewell County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $15,645,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Only contractors that have been pre-qualified in accordance with the procedures in the Pre-qualification Application will be eligible to submit bids for this project. Bids received from those who have not been pre-qualified will not be considered. Construction bids for this project are scheduled to be received in August 2021. The Tazewell Regional Wastewater Treatment Plant Improvement project involves the following elements: Construction of a new wetwell/drywell influent pump station with a mechanical screen system; Replacement of primary sludge, secondary recycle sludge, waste sludge, digested sludge, nonpotable and various other pumps; Construction of a new induced vortex grit removal system at the existing grit building; Replacement of clarifier mechanisms at two primary clarifiers and two secondary clarifiers; Replacement of air diffuser, mixing systems and associated blowers for a dual train MLE activated sludge secondary treatment system; Installation of an MLE MLSS recycle pump system; Replacement of the existing channel UV system; Rehabilitation of an existing dual traveling bridge tertiary filtration system; Replacement of air diffuser systems and associated blowers for two aerobic digesters; A building addition to the existing pre-engineered metal building housing the sludge dewatering system; Installation of a new belt press to replace an existing belt press; Installation of a new belt conveyor for dewatered cake; Demolition of existing glass greenhouse building at dewatered cake storage area; Construction of new open-walled structure over dewatered cake storage area; Replacement of the existing stand-by generator and automatic transfer switch; Replacement of miscellaneous process piping, valves, gates, and meters; Installation of new process instrumentation including DO, pH and ORP meters; Roof replacement at two buildings; Ventilation and heat replacement/improvements at three buildings; Replacement of existing controls and SCADA throughout the plant; Electrical upgrades; Miscellaneous demolition throughout the plant to allow for installation of new equipment. The General Contract for this project is anticipated to be advertised for bid on July 18, 2021. The projected contract award is planned for November 2021, with an anticipated construction start in November/December 2021. The overall construction duration is planned to be 12 months. These are estimated dates and durations and are subject to change. The cost of this project is estimated to be $7.5-9.5 million. The Town of Tazewell reserves the right to reject any and all Applications, and to waive informalities and irregularities in the Pre-qualification Application procedure. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation, Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |