Similar Projects
HDCT HVAC Replacements
Alteration
Bidding
Holland, MI 49423

UVC Air Purification Project
Alteration
Bidding
Royal Oak, MI

Fire Exhaust Fans
Post-Bid
Taylor, MI

Washington Woods Building Chiller Replacement
Post-Bid
Midland, MI

Heating, Ventilation and Air Conditioning (HVAC) Equipment and Building Control Systems Maintenance
Results
Less than $142,000 est. value
Wayne, MI

HVAC Services
Results
Howell, MI

Ventilation Upgrades
Alteration
Bidding
Troy, MI

2020 Kent ISD Lincoln Developmental HRU Repairs
Post-Bid
Grand Rapids, MI

Alger Correctional Facility - Building 200 - HVAC System Upgrades
Results
Munising, MI

FSU/KCAD 17 Fountain Street - Division Building, HVAC Upgrades
Post-Bid
Big Rapids, MI

2 State Police Posts- HVAC Units
Results
Less than $165,500 est. value
Taylor, MI 48180

Police Department Gun Range Ventilation System Repair
Post-Bid
Lincoln Park, MI

New HVAC Root Top Unit at Department of Public Service
Results
Wyandotte, MI

Taylor Sportsplex Evaporative Condenser Replacement
Post-Bid
Taylor, MI

Ice Arena HVAC Replacement Project
Results
Farmington Hills, MI

Last Updated 06/15/2021 09:48 AM
Project Title

RTU Replacement at Central Middle School, Port Huron HS, and Port Huron Northern HS

Physical Address View project details and contacts
City, State (County) Port Huron, MI 48060   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents