Similar Projects
Union Street Phase 2 Sewer Separation
Bidding
Less than $3,600,000 est. value
New Bedford, MA 02740

Water Treatment Chemicals - Cross Connection Services, Sewer Camera Inspection Services, and Septic Pumper Services
Post-Bid
Somerset, MA

Produce and Grease Trap Maintenance
Post-Bid
Taunton, MA

Police and Fire Station Sewer Replacement Project
Results
Less than $105,000 est. value
Fairhaven, MA 02719

Year (5) Five Sewer Rehabilitation
Results
Less than $1,200,000 est. value
North Attleborough, MA

Utility Manhole Frames and Covers
Post-Bid
Taunton, MA

DPW Services - Catch Basin Cleaning
Term Contract
Results
Mansfield, MA

Route 6 Pump Station Improvements and Sewer and Water Rehabilitation
Post-Bid
$920,000 est. value
Somerset, MA

DPW Services - Catch Basin Cleaning with Sump Measurement
Term Contract
Results
Mansfield, MA

Cross County Sewer Line Access Improvements
Results
Less than $100,000 est. value
Raynham, MA

PVC Storm Drain Pipe
Results
Dartmouth, MA

Sewer Upgrade, Roadway and Sidewalk Improvements
Results
Less than $369,765 est. value
Norton, MA 02766

Road Materials - Catch Basins, and Manholes
Results
Berkley, MA

Road Materials - Manhole and Catch Basin Covers
Results
Berkley, MA

Road Materials - Catch Basin Cleaning
Results
Berkley, MA

Last Updated 03/04/2020 11:26 AM
Project Title

Twin Village Fire Station Plumbing Repairs

Physical Address View project details and contacts
City, State (County) Attleboro, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,500
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Supply and install new cast iron sewer drain piping to replace the existing piping. The existing cast iron sewer pipe is cracked. The scope of work shall include the following: 1. Disconnect and remove existing 4-inch drain piping at basement to approximately 4 feet above to second floor bathroom. 2. Install new 4-inch cast iron drain, waste and vent piping from basement to first and second floor bathrooms including vent piping through roof. 3. Total length of 4-inch cast-iron piping is approximately 35 feet. 4. All wall opening and ceiling opening required for piping replacement shall be included. 5. One bathroom shall be kept in service at all times. 6. Total project time shall not exceed 5 business days. 7. Pricing shall include all permits, labor and materials.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents