Similar Projects
Reconstruct Taxiway Alpha - 390-2842 - City of Dubuque
Alteration
Conception
$9,945,000 est. value
Dubuque, IA 52003

Taxiway A Reconstruction - FP001 - City of Davenport
Infrastructure
Conception
$2,695,450 est. value
Davenport, IA 52806

Katowski Drive Box Culvert Replacement - City of Cedar Falls
Infrastructure
Design
Less than $390,000 est. value
Waterloo, IA 50701

Rehabilitate Runway 12/30
Infrastructure
Post-Bid
Charles City, IA 50616

Construct Connector Taxiway FAA AIP
Infrastructure
Post-Bid
$860,000 est. value
Monticello, IA

Runway 7/25 Threshold Relocation
Infrastructure
Results
$529,000 est. value
Iowa City, IA

Rehabilitate Runway 7/25 (East End)
Infrastructure
Results
$128,153 est. value
Iowa City, IA

Taxiway C Reconstruction - FP003 - City of Davenport
Alteration
Conception
$1,292,800 est. value
Davenport, IA 52806

Construct Taxiway and Apron
Infrastructure
Post-Bid
$2,000,000 est. value
Independence, IA 50644

Runway 13-31 Rehabilitation and Lighting Upgrade
Infrastructure
Results
$7,505,185 est. value
Sioux City, IA 51111

48th Street Northeast from Ozark Street to Council Street - City of Cedar Rapids
Infrastructure
Conception
Less than $1,600,000 est. value
Cedar Rapids, IA 52402

Construct Apron and Taxilane For Hangars ReBid
Infrastructure
Post-Bid
$360,000 CJ est. value
Iowa City, IA 52246

Construct Runway 18/36 Grading, Paving and Lighting
Infrastructure
Results
$5,500,000 est. value
Denison, IA 51442

Scrip Road Pedestrian Trail - City of Mason City
Infrastructure
Conception
Less than $225,000 est. value
Mason City, IA

Taxiway D Apron and Access Roadway Paving (Phase 3)
Infrastructure
Results
Less than $604,000 est. value
Ankeny, IA 50021

Last Updated 08/09/2022 09:34 AM
Project Title

Expand Terminal Apron and Relocate Terminal Access Road

Physical Address View project details and contacts
City, State (County) Clear Lake, IA 50428   (Cerro Gordo County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $910,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of construction of aircraft parking apron to support the future passenger terminal. Work area is within the airport perimeter fence, and is to be completed in two construction phases. Engineer's estimate of probable construction cost is between $810,000 and $910,000. Approximate project quantities include: o 2,300 SY Pavement Removal o 5,800 CY Unclassified Excavation o 50 FT Storm Trench Drain o 2,600 SY Recycled Aggregate Base Course and 1,800 SY Modified Subbase o 4,100 SY Concrete Pavement o 5 Acres Seeding, Fertilizing o Associated Erosion Control o Traffic Control The Mason City Municipal Airport has established a construction schedule not to exceed 70 Calendar Days for the primary construction phase, Phase 1. All Phase 1 work shall be completed within 70 calendar days. An initial construction phase, Phase 0, has been established for pavement removals within the footprint of the future terminal building. Phase 0 must be complete by September 10th , 2022. Phase 0 and Phase 1 is subject to liquidated damages as prescribed within the project manual. Bid security in the amount of Five percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful bidder shall be required to provide performance and payment Bonds, each in the amount of 100 percent of the Contract Price. All proposals submitted in accordance with the instructions presented herein will be subject to evaluation. Bids may be held by the Airport Commission for a period not to exceed 30 days from the date of the bid opening for the purpose of conducting the bid evaluation. It is the intent of the Airport Commission, after a period of review and evaluation, to award the contract to the responsible bidder that submits the lowest responsive proposal, meeting the requirements of the technical specifications and supplemental Owner specific additions and clarifications. The right is reserved, as the Airport Commission may require, to reject any and all bids and to waive any informality in the bids received. Goals for minority participation for each trade 2.0% Goals for female participation in each trade 6.9% Representatives of OWNER and ENGINEER will be on the call to discuss the Project. Bidders are encouraged to attend and participate. ENGINEER will transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. For technical questions, contact Ryan Turner (515) 664-7576 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project No. 1-5133

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents