Similar Projects
Phase 5 - Grading Package for Bridgewater
Bidding
TX

Twinwood Parkway Phase 1B, Segment C-D
Bidding
McKinney, TX 75072

Golf Course Infrastructure Repairs – Phase II
Post-Bid
Plano, TX 75025

Retaining Wall Surface Finish Improvements
Term Contract
Post-Bid
$3,400,000 est. value
Plano, TX 75093

Trinity Falls Melissa Road Grading Package
Results
Melissa, TX 75454

Chapman Raw Water Transmission Pipeline Channel Stabilization at the South Sulphur River Crossing Phase 2
Results
$783,000 est. value
Wylie, TX 75098

DC Ranch Drainage Improvements - Phase 1
Bidding
Celina, TX

Pond Maintenance III
Post-Bid
Plano, TX 75023

Phase 3 Grading Package for Bridgewater
Results
Princeton, TX 75407

Three Cities Trail Gabion Wall and Slope Stabilization
Post-Bid
Frisco, TX 75034

Old Stone Dam Upstream Bank Stabilization
Results
Allen, TX 75013

Pond Maintenance Group 1
Post-Bid
$40,000 est. value
Plano, TX 75025

Allenwood Drainage Improvement at Dart Crossing
Results
Allen, TX 75013

Erosion Control at Various Locations - Phase 3
Post-Bid
Dallas, TX

Mckinney National Airport
Results
McKinney, TX 75069

Last Updated 06/08/2020 02:59 PM
Project Title

SRT at US 75 Sloan Creek Erosion Mitigation

Physical Address View project details and contacts
City, State (County) Plano, TX 75093   (Collin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Erosion mitigation of Sloan Creek along the NB SH-121 to SBFR US-75 Ramp. Construction of a concrete drop structure, installation of gabion baskets, gabion mattresses, and rock riprap. Work also includes excavation, embankment, erosion control measures, and furnishing and placing topsoil.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents