Similar Projects
Phase 1 HVAC Replacement Ramsey Street High School
Bidding
Fayetteville, NC 28301

DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

College Lakes Elementary Kitchen A/C
Post-Bid
Fayetteville, NC 28311

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Westover High School HVAC Infrastructure Phase II
Results
Fayetteville, NC 28303

Hope Mills Middle Auditorium Compressor Replacement
Post-Bid
Hope Mills, NC 28348

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Hope Mills Middle Locker Room HVAC Addition
Results
Less than $17,333 est. value
Hope Mills, NC 28348

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

South View Middle School Classroom Area HVAC Upgrade
Results
Hope Mills, NC 28348

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Furnish and Deliver Trenton Products Walk-In Cooler and Freezer Systems
Results
Less than $14,397 est. value
Bonnie Doone, NC 28303

Last Updated 04/15/2021 03:36 PM
Project Title

Pine Forest Middle School A/C and Heat Replacement

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28311   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor is to remove and dispose of existing air handlers and condensing units. Contractor is to install two new 10 ton heat pump condensers and two 10 ton air handlers. The new unit will match existing unit voltage and phase. The Heat Strips shall be 20 kw or greater. The contractor shall upgrade the power for the heat strips if needed. The contractor will install new programmable thermostats. The contractor can reuse existing stand but must replace the filter grilles. The contractor can flush and reuse existing line set or install new line set. The contractor will install new disconnects as needed. Power wiring, and conduit from disconnect to unit shall be new. The contractor is responsible for all permits and inspections.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents