Similar Projects
West Prairie Trace Lift Station
New Construction
Results
$562,693 est. value
Gardner, KS

Sewer Lift Station Improvements
Renovation
Results
$225,000 est. value
McPherson, KS

Decommissioning of 135th and 143rd Pump Stations
Renovation, Term Contract
Results
Leawood, Overland Park, KS 66224

Sewer System Improvements
Renovation, Infrastructure
Post-Bid
$1,800,000 est. value
Independence, KS

Lakeside and Simmons Sewer Pump Station Improvements
Renovation
Post-Bid
Augusta, KS

199th and Webster Pump Station and Force Main
Renovation
Results
Spring Hill, KS

SWS 762 Phase 1 Pump Station 6-9 Repairs
Renovation
Bidding
Wichita, KS

SWS #762 Phase 2 Pump Station 12-13 Repairs
Renovation
Bidding
$700,000 est. value
Wichita, KS

Armourdale Industrial District Pump Station Improvements Construction Manager at Risk Services
Renovation
Results
Kansas City, KS 66118

Booster Pump Station #8 & Transmission Waterline Improvements - Contract B
Renovation, Infrastructure
Results
$1,285,000 est. value
Garden City, KS

SWS 758 Pump Station 7 and 9 Repairs
Renovation
Post-Bid
Wichita, KS

Cedar Mill Pump Station Force Main Replacement
Renovation
Results
Olathe, KS

2021 Main Lift Station and Forcemain Improvements
New Construction
Post-Bid
$1,820,000 est. value
Eudora, KS

Lift Station No. 2 Improvements
New Construction
Results
Emporia, KS

Pump Station 4 Force Main Realignment
Renovation
Results
$500,000 to $600,000 est. value
Kansas City, KS

Reported 04/26/2022 09:08 PM
Project Title

2022 Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Olathe, KS 66061   (Johnson County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Shall include two lift stations for the year 2022. These two lift stations are the Prairie Farms and Mission Ridge lift stations. The Prairie Farms Lift Station is located off of Ward Cliff Drive within Lake Olathe Park just on the west side of the Prairie Farms subdivision. (Exhibit A) The Mission Ridge Lift Station is located north of Sleepy Hollow Drive just on the east side of I-35 (Exhibit B). The project will include review of existing hydraulic conditions, utility coordination, preparation of cost estimates, and the development of construction plans and specifications for the upgrades or complete replacement of these lift stations. Additional services may include assistance with bidding of projects for construction, minor assistance with the review of submittals, and assistance on an as-needed basis throughout construction. Construction of this project is expected to begin in Fall 2022 and completed in Spring 2023.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents