Similar Projects
Horizontal Hung Steam Coil Blower Air Handler Replacement
Bidding
Waterbury, CT 06704

Repair/Replace HVAC Autologic Controls
Term Contract
Bidding
Wallingford, CT

Cooling Tower Replacement and Sprinkler System Modification
Post-Bid
Seymour, CT

Chillers Service Maintenance and Repairs
Term Contract
Post-Bid
Waterbury, CT 06706

Replacement of the Air Handling Units at Amity Regional High School
Results
Less than $644,000 est. value
Woodbridge, CT 06525

Furnace Replacement
Results
East Haven, CT 06513

Amity High Cooling Tower Piping Replacement
Bidding
Woodbridge, CT 06525

RTU Replacement to Long River Middle School
Post-Bid
Prospect, CT 06712

HVAC and Electrical Upgrades at Melissa Jones Elementary School
Results
Less than $1,374,300 est. value
Guilford, CT

HVAC and Process Improvements at The Lake Whitney Water Treatment Plant
Bidding
New Haven, CT

J045--PM Boiler Burners
Post-Bid
Newington, West Haven, CT

Mini-Split AC/Heat Pump Installations, 6 Locations in CT
Results
Colebrook, Middlebury, Stamford, Thomaston, CT 06905

HVAC System Maintenance and Repair Services
Term Contract
Bidding
Wallingford, CT

Fire Headquarters Kitchen Hood Project
Post-Bid
Naugatuck, CT 06770

Furnish and Install Replacement HVAC Unit at Parks and Recreation Gymnasium
Results
Wallingford, CT

Last Updated 02/26/2020 11:08 AM
Project Title

Service to Cooling Tower, Chiller and Condenser

Physical Address View project details and contacts
City, State (County) Waterbury, CT   (New Haven County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Drain the Cooling Tower, associated piping and water supply to prevent damage from freezing 2. Clean Cooling Tower upper and lower basins 3. Clean spray nozzles on top of unit. Punch each nozzle to clear any debris. 4. Complete Cooling Tower Motor inspection and check 5. Inspect and check fan 6. Inspect Fan and Shaft Bearings 7. Inspect external condition of Cooling Tower 8. Verify Water Level Float 9. Check Mechanical Operations 10. Grease cooling tower bearings and fan motor bearings 11. Replace Cooling Tower belt 12. Open up water cooled condenser end bells on chiller. Punch-Out tubes and reinstall end bells with new gaskets 13. Remove strainers from both Bell & Gosset Suction Diffusers in condensing Loop. 1. Replace with new strainers, gaskets and O-rings 2. Re-Install Strainers 3. Model Number GF-3 14. Notify City of any issued found during maintenance. 15. Note Hose Spigot is not in direct vicinity of unit. Vendor shall provide extra hose lengths.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents