Similar Projects
Protective Window Film
Term Contract
Bidding
Philadelphia, PA

Cooling Equipment Repair And Maintenance
Renovation
Bidding
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Bally Walk-In Freezer
Post-Bid
Philadelphia, PA

Air Conditioner 10,000 Btu 120 V R410a
Results
Less than $25,000 est. value
Philadelphia, PA

J--Philadelphia Information Technology Center (Pitc) Cyberex Power Distribution Units (Pdus) And Wavestar Static Transfer Switches (Sts) Maintenance
Results
Philadelphia, PA 19144

Major HVAC Renovation at Franklin S Edmonds School - Electrical
Alteration
Bidding
$1,023,250 est. value
Philadelphia, PA 19150

Compressor (New) Cummins 5286681 Air
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Bullet-Resistan Transaction Window
Results
Less than $25,000 est. value
Philadelphia, PA

Removal and Replacement of Utility Poles at the Passyunk Plant
Alteration
Bidding
Philadelphia, PA 19153

Window Arow Global ASM MV73
Post-Bid
Philadelphia, PA 19107

Emergency HVAC Repair Service
Term Contract
Results
Philadelphia, PA 19102

Conshohocken Station Glass Block and Solid Phenolic Windscreen Panels
Alteration
Bidding
Philadelphia, PA

Emergency Glass Repair
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Construction for the Career and Advanced Technology Center - Electrical Construction
Results
Philadelphia, PA 19139

Last Updated 06/11/2021 04:06 PM
Project Title

Frankford High School Solar Lab HVAC, Electrical & Window

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19124   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC to provide adequate climate control and ventilation for this newly repurposed space. The HVAC contractor will be the lead prime contractor for purposes of scheduling and coordination. Electrical to create a hands-on learning environment for students to work with solar PV modules and battery systems Window installation to add natural daylight to the solar lab.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents