Similar Projects
North Choctaw Road, East 66 Highway - 1100 Feet north of the intersection of N Choctaw Road and East 66 Highway (Ward 7) - City of Oklahoma City
New Construction, Demolition, Infrastructure
Conception
$415,000 est. value
Oklahoma City, OK 73054

Bridge and Approaches
New Construction, Infrastructure
Design
$39,037,000 est. value
Edmond, OK 73025

BNSF OKC River Connection
New Construction, Alteration
Post-Bid
Oklahoma City, OK

Pedestrian Bridge Ray Trent Park
New Construction, Infrastructure
Post-Bid
$200,000 est. value
Del City, OK 73115

Grade, Drain, Surface, and Bridge Rehabilitation
New Construction
Results
Oklahoma City, OK

Bridge Repair
New Construction
Results
Oklahoma City, OK

Ray Trent Park Pedestrian Bridge
New Construction, Infrastructure
Post-Bid
$200,000 est. value
Del City, OK 73115

Myriad Gardens Crystal Bridge Renovation
Renovation
Results
OK 73102

Bridge Water Proof Seal
New Construction, Infrastructure
Results

Bridge Rehabilitation
New Construction, Infrastructure
Results
Oklahoma City, OK

New Pedestrian Bridge & Water Line Relocation NW Expressway and W Wilshire Blvd
Infrastructure
Results
$3,851,000 est. value
Oklahoma City, OK 73195

Bridge Replacement, 530 Feet South of SE 149th Street and South Douglas Boulevard
Infrastructure
Results
$1,311,469 est. value
Oklahoma City, OK

Grade, Drain, Surface, and Bridge
New Construction, Infrastructure
Results
OK

Unit Price Bridge Repair/Rehabilitation/Replacement City Wide
Infrastructure
Results
$3,000,000 est. value
Oklahoma City, OK

Joe B. Barnes Regional Park Pedestrian Bridge
Infrastructure
Results
Midwest City, OK 73110

Reported 06/21/2022 04:34 PM
Project Title

North May Avenue, Northwest Expressway - May Avenue over Northwest Expressway (Ward 2) - City of Oklahoma City

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73195   (Oklahoma County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $1,925,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, paving, outdoor lighting and new construction of a civil project in Oklahoma City, Oklahoma. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for outdoor lighting for a road / highway; road / highway; and water / sewer project. Replacement, construction, reconstruction, rehabilitation, repair, or improvement of bridges. May include appurtenances, AE, ROW, utility relocation, drainage, lighting, or approach improvements. Estimated annual operating cost is $0. The project is included in the City of Oklahoma City's FY 2023 Capital Improvement Program (CIP). As of June 20, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents