Similar Projects
MM Five Lane Part 3 - City of Republic
Infrastructure
Conception
$4,000,000 est. value
Republic, MO

MM Five Lane Part 2 - City of Republic
Infrastructure
Conception
$3,200,000 est. value
Republic, MO

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Post-Bid
Willard, MO 65781

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Farm Road 115 and State Highway EE Roadway Improvements
Results
Springfield, MO

Major Street Resurfacing
Infrastructure
Results
Springfield, MO

Miller Road Extension (West of Miller Crossing subdivision) - City of Republic
Infrastructure
Conception
Less than $500,000 est. value
Republic, MO 65738

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Kansas Expressway Extension Phase I
Infrastructure
Results
Springfield, MO

Bailey Extension 2 - City of Republic
Infrastructure
Conception
Less than $300,000 est. value
Republic, MO 65738

2022 Campus Pavement Renewal
Infrastructure
Post-Bid
$200,000 est. value
Springfield, MO 65802

Intersection Improvement
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
MO

MM Five Lane Part 1 - City of Republic
Infrastructure
Conception
$2,000,000 est. value
Republic, MO

Resurface
Infrastructure
Results
$750,000 to $1,000,000 est. value
MO

Farm Road 103 (Future MM) South Of US 60 - City of Republic
Infrastructure
Conception
$1,500,000 est. value
Republic, MO 65619

Reported 06/17/2022 09:19 AM
Project Title

East Miller Road Expansion - City of Republic

Physical Address View project details and contacts
City, State (County) Republic, MO 65738   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected September 2023
Bids Due View project details and contacts
Estimated Value Less than $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Widen Miller Road from Lynn to Basswood. The project is included in the City of Republic's FY 2022-2026 Capital Improvement Program (CIP). As of June 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents