Project Title | City Park Sidewalk Phase II |
Physical Address | View project details and contacts |
City, State (County) | Early, TX 76802 (Brown County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Concrete Sidewalk 1. Construct 4" or 6" thick concrete sidewalk according to Item 531 as called out in the plans. Sidewalk payment will be measured in place by square yard of surface area. Expansion joints should be placed at section lengths greater than 8 ft. but less than 20 ft. 2. For large concrete surface areas on site layout sheets, contractor shall submit a joint layout plan for approval by the engineer. The maximum area allowable without a joint is 144 SF (12'x12'). All light fixtures, trees and utility fixtures are to remain in place with a minimum of 2' buffer around each feature to be filled with crushed rock. 3. Movable benches shall be moved and re-set as needed to construct concrete pathways and pads. This work is subsidiary to installation of concrete work. Retaining Wall 1. Prior to placement of any retaining wall or concrete surface around edge of field contractor shall coordinate with the City of Early to allow for pole placement and backstop fixtures. 2. Surface finish of retaining wall shall be rock type matched to Tee-ball field located within the ball park facility. Contractor to provide a concrete wall with brick ledge. Stone work to be completed by the City of Early. 3. Retaining wall components feature both freestanding sections and backfilled sections according to grade around fill. Backfilled sections shall follow details provided for retaining wall to proposed ground tie-in points. Grading behind wall shall be flush with cap as to not impound water without drainage away from wall. 4. Fixed stairs shall be constructed according to OSHA 1917.120. 5. In areas around dugout contractor shall coordinate with City of Early for details regarding dugout construction. Above wall features, fencing, dugout furniture and misc. items are to be constructed by the City of Early as finish out of the dugout. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |